My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 01292019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 01292019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 2:49:37 PM
Creation date
1/23/2019 2:48:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING PROCESSINTRODUCTION SERVICE AREA VISION PARK PLANS IMPLEMENTATION <br />EAST OF THE RIVER PARK MASTER PLAN <br />OPERATIONS AND <br />MAINTENANCE <br />SECTION K: Industrial Blvd NE and S of Broadway St NE (100’ Existing ROW) <br />*Note: Option <br />retains existing <br />median width and <br />lane width. Location <br />may change as ROW <br />is further defined. <br />*Note: Parking <br />could be added by <br />narrowing median, <br />but also runs risk <br />for semi-trucks <br />parking there for <br />long periods due to <br />location. <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’ <br />6’6’8’6’6’ <br />30’ <br />30’ <br />26’ <br />4’ <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />MEDIAN / TURN LANE <br />MEDIAN / TURN LANE <br />MEDIAN / TURN LANE <br />BOULE- <br />VARD <br />SIDEWALK SIDEWALK <br />SIDEWALKPROPOSED <br />PROPOSED <br />EXISTING <br />12’ <br />14’ <br />12’ <br />13’13’13’13’ <br />12’12’ <br />14’14’ <br />12’ <br />TRAIL <br />TRAIL <br />LANE <br />LANE LANE LANE LANE <br />LANE LANE <br />LANELANE <br />LANE <br />SECTION K: Industrial Blvd NE and S of Broadway St NE (100’ Existing ROW) <br />*Note: Option <br />retains existing <br />median width and <br />lane width. Location <br />may change as ROW <br />is further defined. <br />*Note: Parking <br />could be added by <br />narrowing median, <br />but also runs risk <br />for semi-trucks <br />parking there for <br />long periods due to <br />location. <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’ <br />6’6’8’6’6’ <br />30’ <br />30’ <br />26’ <br />4’ <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />MEDIAN / TURN LANE <br />MEDIAN / TURN LANE <br />MEDIAN / TURN LANE <br />BOULE- <br />VARD <br />SIDEWALK SIDEWALK <br />SIDEWALKPROPOSED <br />PROPOSED <br />EXISTING <br />12’ <br />14’ <br />12’ <br />13’13’13’13’ <br />12’12’ <br />14’14’ <br />12’ <br />TRAIL <br />TRAIL <br />LANE <br />LANE LANE LANE LANE <br />LANE LANE <br />LANELANE <br />LANE <br />SECTION K: Industrial Blvd NE and S of Broadway St NE (100’ Existing ROW) <br />*Note: Option <br />retains existing <br />median width and <br />lane width. Location <br />may change as ROW <br />is further defined. <br />*Note: Parking <br />could be added by <br />narrowing median, <br />but also runs risk <br />for semi-trucks <br />parking there for <br />long periods due to <br />location. <br />SCALE: 1/8”=1’ <br />0 8’6’2’4’ <br />6’ <br />6’6’8’6’6’ <br />30’ <br />30’ <br />26’ <br />4’ <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />BOULE- <br />VARD <br />MEDIAN / TURN LANE <br />MEDIAN / TURN LANE <br />MEDIAN / TURN LANE <br />BOULE- <br />VARD <br />SIDEWALK SIDEWALK <br />SIDEWALKPROPOSED <br />PROPOSED <br />EXISTING <br />12’ <br />14’ <br />12’ <br />13’13’13’13’ <br />12’12’ <br />14’14’ <br />12’ <br />TRAIL <br />TRAIL <br />LANE <br />LANE LANE LANE LANE <br />LANE LANE <br />LANELANE <br />LANE <br />SECTION J: INDUSTRIAL BLVD NE AND S OF BROADWAY ST NE (100’ EXISTING ROW) <br />EXISTING <br />PROPOSED <br />PROPOSED <br />SECTION KEY <br />J <br />INDUSTRIAL BLVD NEBROADWAY ST NE <br />274
The URL can be used to link to this page
Your browser does not support the video tag.