Laserfiche WebLink
2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. R-011648-000 PAGE 9 <br />7. FEASIBILITY AND RECOMMENDATION <br />Project costs are anticipated to be approximately $2.45 million. <br />Due to the poor structural condition of portions of the street sections, the deterioration of the <br />existing sanitary sewer system and frequent water main breaks, this project is both feasible and <br />necessary from an engineering standpoint. <br />Based on our analysis and data presented, the proposed project is feasible, necessary, and cost <br />effective from an engineering standpoint. We recommend reconstruction of the sanitary sewer, <br />water main, stormwater collection system, and the street as detailed in this report. <br />106