Laserfiche WebLink
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE G - DRAINAGE IMPROVEMENTS <br />171 2104.502 REMOVE DRAINAGE STRUCTURE EACH $500.00 3 $1,500.00 <br />172 2104.503 REMOVE SEWER PIPE (STORM)L F $10.00 200 $2,000.00 <br />173 2451.507 COARSE AGGREGATE BEDDING (LV)C Y $40.00 97 $3,880.00 <br />174 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V L F $44.00 200 $8,800.00 <br />175 2503.503 18" RC PIPE SEWER DESIGN 3006 CLASS V L F $52.00 900 $46,800.00 <br />176 2503.602 CONNECT TO EXISTING STORM SEWER EACH $1,200.00 1 $1,200.00 <br />177 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH $2,200.00 2 $4,400.00 <br />178 2506.502 CASTING ASSEMBLY (STORM)EACH $600.00 7 $4,200.00 <br />179 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 L F $450.00 50 $22,500.00 <br />$95,280.00 <br />$9,528.00 <br />$104,808.00 <br />$26,202.00 <br />$131,010.00 <br />OPINION OF PROBABLE COSTS <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. R-011648-000 <br />ST ANTHONY, MN <br />APRIL 9, 2019 <br />TOTAL SCHEDULE G - DRAINAGE IMPROVEMENTS <br />32ND AVENUE AND CROFT DRIVE <br />SUBTOTAL SCHEDULE G - DRAINAGE IMPROVEMENTS <br />+ 10% CONTINGENCIES <br />SUBTOTAL SCHEDULE G - DRAINAGE IMPROVEMENTS <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />126