My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04092019
StAnthony
>
City Council
>
City Council Packets
>
2019
>
CC PACKET 04092019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 8:52:44 AM
Creation date
4/5/2019 8:49:30 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
No.Mat. No.Item Units Estimated <br />Unit Price <br />Estimated <br />Quantity <br />Estimated <br />Cost <br />SCHEDULE H - DRAINAGE IMPROVEMENTS <br />180 2105.604 GEOTEXTILE FABRIC TYPE 4 S Y $5.00 400 $2,000.00 <br />181 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V L F $52.00 300 $15,600.00 <br />182 2503.503 18" RC PIPE SEWER DESIGN 3006 CLASS V L F $58.00 100 $5,800.00 <br />183 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH $2,500.00 2 $5,000.00 <br />184 2506.502 CASTING ASSEMBLY (STORM)EACH $750.00 4 $3,000.00 <br />185 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 L F $550.00 30 $16,500.00 <br />186 2507.503 18" RC PIPE APRON EACH $1,000.00 1 $1,000.00 <br />187 2511.501 RANDOM RIPRAP CLASS III C Y $200.00 10 $2,000.00 <br />$50,900.00 <br />$2,545.00 <br />$53,445.00 <br />$13,361.25 <br />$66,806.25 <br />+ 25% ADMINISTRATIVE, LEGAL, ETC. <br />TOTAL SCHEDULE H - DRAINAGE IMPROVEMENTS <br />SILVER LAKE TERRACE <br />SUBTOTAL SCHEDULE H - DRAINAGE IMPROVEMENTS <br />+ 5% CONTINGENCIES <br />SUBTOTAL SCHEDULE H - DRAINAGE IMPROVEMENTS <br />OPINION OF PROBABLE COSTS <br />2020 STREET AND UTILITY IMPROVEMENT PROJECT <br />PROJECT NO. R-011648-000 <br />ST ANTHONY, MN <br />APRIL 9, 2019 <br />127
The URL can be used to link to this page
Your browser does not support the video tag.