Project: 02170-42 - STAN - Silver Lake Road Flooding Analysis Engineers Estimate Rachel Contracting, Inc. Minger ConstructionCompanies, Inc. Park Construction Company - Mpls Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceSilver Lake Road Flood Reduction Project 1 2021.501 MOBILIZATION LS 1$25,900.00$25,900.00$27,500.00$27,500.00$40,500.00$40,500.00$77,000.00$77,000.002 2101.524 CLEARING TREE 5$500.00$2,500.00$344.50$1,722.50$556.50$2,782.50$692.00$3,460.003 2101.524 GRUBBING TREE 5$500.00$2,500.00$344.50$1,722.50$556.50$2,782.50$277.00$1,385.004 2104.502 REMOVE DRAINAGE STRUCTURE EACH 4$650.00$2,600.00$605.50$2,422.00$288.50$1,154.00$990.00$3,960.005 2104.502 REMOVE HANDHOLE EACH 1$500.00$500.00$954.50$954.50$835.00$835.00$1,200.00$1,200.006 2104.503 SAWING CONCRETE PAVEMENT L F 40$8.00$320.00$9.10$364.00$8.35$334.00$8.55$342.007 2104.503 SAWING BITUMINOUS PAVEMENT L F 2100$4.00$8,400.00$2.30$4,830.00$2.05$4,305.00$2.10$4,410.008 2104.503 REMOVE WATER MAIN L F 30$15.00$450.00$25.50$765.00$24.10$723.00$28.50$855.009 2104.503 REMOVE SEWER PIPE (STORM) L F 90$15.00$1,350.00$18.50$1,665.00$22.25$2,002.50$29.90$2,691.0010 2104.503 REMOVE CONCRETE CURB L F 400$8.00$3,200.00$5.50$2,200.00$3.60$1,440.00$4.75$1,900.0011 2104.503 REMOVE FORCE MAIN L F 100$50.00$5,000.00$48.90$4,890.00$50.60$5,060.00$28.50$2,850.0012 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 2800$8.00$22,400.00$6.40$17,920.00$7.05$19,740.00$5.55$15,540.0013 2104.518 REMOVE CONCRETE WALK S F 1000$6.00$6,000.00$1.00$1,000.00$3.65$3,650.00$2.65$2,650.0014 2104.603 ABANDON STORM SEWER L F 50$14.00$700.00$31.40$1,570.00$39.45$1,972.50$39.20$1,960.0015 2105.507 SUBGRADE EXCAVATION C Y 900$22.00$19,800.00$21.45$19,305.00$26.20$23,580.00$24.00$21,600.0016 2112.601 SUBGRADE PREPERATION (SPECIAL) ROAD STA 9$250.00$2,250.00$1,370.00$12,330.00$2,461.00$22,149.00$583.00$5,247.0017 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 40$140.00$5,600.00$155.00$6,200.00$167.00$6,680.00$138.00$5,520.0018 2211.507 AGGREGATE BASE (CV) CLASS 5 C Y 900$35.00$31,500.00$36.80$33,120.00$53.15$47,835.00$44.90$40,410.0019 2331.603 JOINT ADHESIVE L F 400$1.00$400.00$2.60$1,040.00$3.50$1,400.00$2.35$940.0020 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 200$5.00$1,000.00$5.75$1,150.00$5.35$1,070.00$7.70$1,540.0021 2360.509 TYPE SP 12.5 NON WEAR COURSE MIX (4;C) TON 700$72.00$50,400.00$103.84$72,688.00$96.65$67,655.00$107.00$74,900.0022 2360.509 TYPE SP 12.5 WEARING COURSE MIX (4;F) TON 500$75.00$37,500.00$108.04$54,020.00$100.50$50,250.00$103.00$51,500.0023 2411.502 CONCRETE RETAINING WALL EACH 1$10,000.00$10,000.00$66,500.00$66,500.00$65,000.00$65,000.00$100,600.00$100,600.0024 2451.507 COARSE AGGREGATE BEDDING (LV) C Y 200$25.00$5,000.00$48.60$9,720.00$72.45$14,490.00$78.00$15,600.0025 2503.503 24" RC PIPE SEWER DES 3006 CL III L F 110$75.00$8,250.00$120.50$13,255.00$98.55$10,840.50$125.00$13,750.0026 2503.503 36" RC PIPE SEWER DES 3006 CL III L F 890$80.00$71,200.00$189.54$168,690.60$189.50$168,655.00$178.00$158,420.0027 2503.602 CONSTRUCT BULKHEAD EACH 1$500.00$500.00$308.50$308.50$1,624.50$1,624.50$474.00$474.0028 2503.602 CONCRETE SADDLE EACH 1$2,500.00$2,500.00$3,090.00$3,090.00$982.50$982.50$1,790.00$1,790.0029 2504.602 WATERMAIN OFFSET EACH 1$8,000.00$8,000.00$6,510.00$6,510.00$5,797.50$5,797.50$5,970.00$5,970.0030 2505.601 UTILITY COORDINATION L S 1$1,500.00$1,500.00$3,670.00$3,670.00$556.50$556.50$1,000.00$1,000.0031 2506.502 CASTING ASSEMBLY EACH 7$700.00$4,900.00$810.00$5,670.00$3,429.00$24,003.00$1,760.00$12,320.0032 2506.503 CONST DRAINAGE STRUCTURE DES 60-4020 L F 22$750.00$16,500.00$676.50$14,883.00$593.00$13,046.00$678.00$14,916.0033 2506.503 CONST DRAINAGE STRUCTURE DES 72-4020 L F 20$900.00$18,000.00$1,670.00$33,400.00$1,001.00$20,020.00$1,550.00$31,000.0034 2506.503 CONST DRAINAGE STRUCTURE DES 84-4020 L F 14$1,250.00$17,500.00$1,110.00$15,540.00$1,011.00$14,154.00$2,490.00$34,860.00Page 4 of 702170-42 - Project Bid Abstract139