|
Project: 02170-42 - STAN - Silver Lake Road Flooding Analysis Engineers Estimate Astech Corp. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal Price35 2506.602 CONST DRAINAGE STRUCTURE DESIGN SPEC 2 EACH 4$10,000.00$40,000.00$37,800.00$151,200.0036 2506.602 CONST DRAINAGE STRUCTURE DESIGN SPEC 3 EACH 1$75,000.00$75,000.00$104,750.00$104,750.0037 2521.518 4" CONCRETE WALK S F 700$10.00$7,000.00$7.50$5,250.0038 2521.518 4" CONCRETE WALK SPECIAL S F 200$25.00$5,000.00$15.70$3,140.0039 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 400$32.00$12,800.00$31.50$12,600.0040 2531.503 CONCRETE MEDIAN (NOSE) S Y 50$100.00$5,000.00$93.50$4,675.0041 2550.502 HANDHOLE TYPE PVC METAL FRAME EACH 1$500.00$500.00$2,800.00$2,800.0042 2563.601 TRAFFIC CONTROL LS 1$10,000.00$10,000.00$10,800.00$10,800.0043 2565.602 RIGID PVC LOOP DETECTOR 6'X6' EACH 5$2,500.00$12,500.00$1,650.00$8,250.0044 2565.602 RIGID PVC LOOP DETECTOR 6'X15' EACH 2$3,500.00$7,000.00$1,750.00$3,500.0045 2571.524 DECIDUOUS TREE 3" CAL B&B TREE 5$650.00$3,250.00$850.00$4,250.0046 2573.501 STABILIZED CONSTRUCTION EXIT LS 1$2,000.00$2,000.00$2,000.00$2,000.0047 2573.502 STORM DRAIN INLET PROTECTION EACH 12$150.00$1,800.00$250.00$3,000.0048 2573.503 SILT FENCE; TYPE MS L F 100$3.00$300.00$5.00$500.0049 2573.503 FLOTATION SILT CURTAIN TYPE STILL WATER L F 100$10.00$1,000.00$30.00$3,000.0050 2573.503 SEDIMENT CONTROL LOG TYPE COMPOST L F 200$5.00$1,000.00$3.00$600.0051 2574.507 BOULEVARD TOPSOIL BORROW C Y 30$32.00$960.00$38.00$1,140.0052 2574.508 FERTILIZER TYPE 3 LB 10$5.00$50.00$10.00$100.0053 2575.504 EROSION CONTROL BLANKETS CATEGORY 3N S Y 200$5.00$1,000.00$3.50$700.0054 2575.504 RAPID STABILIZATION METHOD 4 S Y 200$5.00$1,000.00$7.50$1,500.0055 2575.505 SEEDING ACRE 0.03$25,000.00$750.00$38,000.00$1,140.0056 2575.508 SEED MIXTURE 25-131 LB 10$10.00$100.00$27.50$275.0057 2575.523 WATER MGAL 10$25.00$250.00$45.00$450.0058 2575.601 TURF ESTABLISHMENT MAINTENANCE L S 1$5,000.00$5,000.00$18,000.00$18,000.00Total Silver Lake Road Flood Reduction Project: $587,380.00 $1,017,277.20 Total Silver Lake Road Flood Reduction Project: $587,380.00 $1,017,277.20 Totals for Project 02170-42 $587,380.00 $1,017,277.20 % of Estimate for Project 02170-42 73.19%I hereby certify that this is an exact reproduction of bids received.Certified By: _______________________________ License No. ________Date: __________Page 7 of 702170-42 - Project Bid Abstract45857January 30, 2019142
|