Laserfiche WebLink
Project: 02170-42 - STAN - Silver Lake Road Flooding Analysis Engineers Estimate Astech Corp. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceSilver Lake Road Flood Reduction Project 1 2021.501 MOBILIZATION LS 1$25,900.00$25,900.00$82,995.00$82,995.002 2101.524 CLEARING TREE 5$500.00$2,500.00$486.00$2,430.003 2101.524 GRUBBING TREE 5$500.00$2,500.00$432.00$2,160.004 2104.502 REMOVE DRAINAGE STRUCTURE EACH 4$650.00$2,600.00$745.00$2,980.005 2104.502 REMOVE HANDHOLE EACH 1$500.00$500.00$500.00$500.006 2104.503 SAWING CONCRETE PAVEMENT L F 40$8.00$320.00$7.70$308.007 2104.503 SAWING BITUMINOUS PAVEMENT L F 2100$4.00$8,400.00$3.00$6,300.008 2104.503 REMOVE WATER MAIN L F 30$15.00$450.00$19.44$583.209 2104.503 REMOVE SEWER PIPE (STORM) L F 90$15.00$1,350.00$12.10$1,089.0010 2104.503 REMOVE CONCRETE CURB L F 400$8.00$3,200.00$5.00$2,000.0011 2104.503 REMOVE FORCE MAIN L F 100$50.00$5,000.00$19.50$1,950.0012 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 2800$8.00$22,400.00$4.65$13,020.0013 2104.518 REMOVE CONCRETE WALK S F 1000$6.00$6,000.00$1.00$1,000.0014 2104.603 ABANDON STORM SEWER L F 50$14.00$700.00$30.24$1,512.0015 2105.507 SUBGRADE EXCAVATION C Y 900$22.00$19,800.00$25.00$22,500.0016 2112.601 SUBGRADE PREPERATION (SPECIAL) ROAD STA 9$250.00$2,250.00$330.00$2,970.0017 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 40$140.00$5,600.00$165.00$6,600.0018 2211.507 AGGREGATE BASE (CV) CLASS 5 C Y 900$35.00$31,500.00$39.75$35,775.0019 2331.603 JOINT ADHESIVE L F 400$1.00$400.00$1.45$580.0020 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 200$5.00$1,000.00$3.00$600.0021 2360.509 TYPE SP 12.5 NON WEAR COURSE MIX (4;C) TON 700$72.00$50,400.00$86.20$60,340.0022 2360.509 TYPE SP 12.5 WEARING COURSE MIX (4;F) TON 500$75.00$37,500.00$88.78$44,390.0023 2411.502 CONCRETE RETAINING WALL EACH 1$10,000.00$10,000.00$150,000.00$150,000.0024 2451.507 COARSE AGGREGATE BEDDING (LV) C Y 200$25.00$5,000.00$37.00$7,400.0025 2503.503 24" RC PIPE SEWER DES 3006 CL III L F 110$75.00$8,250.00$76.00$8,360.0026 2503.503 36" RC PIPE SEWER DES 3006 CL III L F 890$80.00$71,200.00$136.00$121,040.0027 2503.602 CONSTRUCT BULKHEAD EACH 1$500.00$500.00$1,540.00$1,540.0028 2503.602 CONCRETE SADDLE EACH 1$2,500.00$2,500.00$2,025.00$2,025.0029 2504.602 WATERMAIN OFFSET EACH 1$8,000.00$8,000.00$6,400.00$6,400.0030 2505.601 UTILITY COORDINATION L S 1$1,500.00$1,500.00$2,500.00$2,500.0031 2506.502 CASTING ASSEMBLY EACH 7$700.00$4,900.00$2,530.00$17,710.0032 2506.503 CONST DRAINAGE STRUCTURE DES 60-4020 L F 22$750.00$16,500.00$650.00$14,300.0033 2506.503 CONST DRAINAGE STRUCTURE DES 72-4020 L F 20$900.00$18,000.00$1,370.00$27,400.0034 2506.503 CONST DRAINAGE STRUCTURE DES 84-4020 L F 14$1,250.00$17,500.00$1,600.00$22,400.00Page 6 of 702170-42 - Project Bid Abstract141