My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04092019
StAnthony
>
City Council
>
City Council Packets
>
2019
>
CC PACKET 04092019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2019 8:52:44 AM
Creation date
4/5/2019 8:49:30 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2019 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. R-011648-000 PAGE 2 <br />2. INTRODUCTION <br />2.1 Authorization <br />On May 22, 2018 the St. Anthony Village City Council authorized the preparation of an <br />engineering Feasibility Report for the 2019 Street and Utility Improvement Project. This project <br />was authorized under City of St. Anthony Village Resolution 18-045. <br />2.2 Scope <br />Infrastructure improvements proposed to be completed in 2019 include: <br />Flood improvements on Silver Lake Road from approximately 250 feet south of Silver <br />Lane to approximately 600 feet north of Silver Lane. Cooperative project with Ramsey <br />County, Rice Creek Watershed Management Organization and Minnesota Department of <br />Natural Resources. <br />County Road C Improvements - cooperative project with Ramsey County, Hennepin <br />County and Mississippi Watershed Management Organization. <br />Bituminous trail improvements <br />Concrete sidewalk improvements <br />Watermain, sanitary sewer, and storm sewer improvements <br />Industrial Park drainage and flood improvements <br />Flashing Yellow Left Turn Signal improvements at the intersection of Silver Lake Road <br />and 33rd Avenue NE <br />Alternate improvements for City Council consideration in either 2019 or 2020 include the <br />following: <br />County Road C Improvements - cooperative project with Ramsey County and Hennepin <br />County <br />Bituminous trail extension through the cemetery from County Road C (29th Avenue <br />NE) to the south existing bituminous trail <br />Highway 88 turn lane improvements <br />Bituminous mill and overlay improvements along the following streets: <br />Silver Lane from Stinson Boulevard to Silver Lake Road <br />Silver Lake Terrace from Silver Lane to the north cul-de-sac <br />2.3 Data Available <br />Information and materials used in the preparation of this report include the following: <br />City of St. Anthony Village Record Drawings <br />City of St. Anthony Village Topographic Maps <br />Subsurface Exploration <br />Field observations of area <br />2.4 Project Location <br />The project is in various locations throughout the City of St. Anthony Village. <br />The project area is identified on Figure 1 in Appendix A of this report. <br />64
The URL can be used to link to this page
Your browser does not support the video tag.