Laserfiche WebLink
2019 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. R-011648-000 PAGE 8 <br />4. FINANCING <br />4.1 Opinion of Probable Construction Cost <br />A detailed breakdown of the Cost Opinion for the proposed project is included in Appendix B. <br />The opinion of cost incorporates the construction costs experienced during 2016, 2017 and 2018, <br />and includes a 10% contingency factor. Administrative costs are projected at 25% of the <br />construction cost and include engineering, legal, financing, and other administrative costs. A <br />summary of the project costs is as follows: <br />Total Cost <br />$717,000 <br />$199,500 <br />$179,300 <br />$121,800 <br />$235,000 <br />$310,500 <br />$300,000 <br />$43,700 <br />$2,106,800 <br />Total Cost <br />$175,500 <br />$353,700 <br />$731,600 <br />$1,260,800 <br />Bituminous Trail Improvements <br />Concrete Sidewalk Improvements <br />From City Limits to County Road 88 (north side of County Road C) <br />Sanitary Sewer Improvements <br />Watermain Improvements <br />Drainage Improvements <br />From City Limits to County Road 88 (south side of County Road C) <br />Industrial Park <br />Pond Improvements <br />Public Utilities <br />Mill and Overlay Improvements <br />Total Alternate Improvements <br />2019 STREET AND UTILITY IMPROVEMENTS <br />City of Saint Anthony Village, Minnesota <br />Opinion of Probable Cost <br />Total County Road C Improvements <br />Proposed Improvements <br />Total Silver Lake Road Flood Mitigation Improvements <br />Silver Lake Road and 33rd Avenue NE Signal Improvements <br />Total Proposed Improvements <br />Alternate Improvements <br />Total County Road C Improvements <br />Bituminous Trail Improvements <br />From County Road C to south of Cemetery <br />Turn Lane Improvements <br />CSAH 88 Free-Right-Turn Lane Removal <br />70