My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 04292008
StAnthony
>
City Council
>
City Council Work Session
>
2008
>
CC WORKSESSION 04292008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 3:26:21 PM
Creation date
7/2/2019 3:26:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF ST. ANTHONY <br />ASSESSMENT POLICY <br />Adopted March 2008 <br />ASSESSMENT PERIOD <br />Sanitary Sewer <br />10 years <br />Water Main <br />10 years <br />Storm Sewer <br />10 years <br />Street Construction <br />10 years <br />Street Resurfacing <br />10 years <br />Sidewalks <br />10 years <br />For multiple improvement types that occur as part of the same project, the assessment shall be 15 <br />years. No assessment for a single improvement shall exceed 10 years. <br />The following sets forth the City's general assessment policies, but these policies may be modified to <br />the extent necessary to result in special assessment amounts which do not exceed the special benefits <br />to the respective properties being assessed, unless greater assessments have been agreed to by the <br />owners impacted by the proposed improvements. <br />UPGRADING OF PUBLIC ROADWAYS <br />For reconstruction of existing roadways, the City's policy is to replace the existing surface, whether <br />concrete or bituminous, with bituminous roadways and concrete curb and gutter. <br />For street reconstruction, 35% of the cost for a project will be obtained from sources other than ad <br />valorem taxes. For street overlay, 50% of the cost for a project will be obtained from sources other <br />than ad valorem taxes. <br />All property will be assessed on a basis of front footage as specified below. <br />1) Non tax - exempt property zoned R -1, R -IA, R -2, and R -3 shall be assessed a minimum of <br />35 %, and the overlay 50 %, of the actual cost for a 7 -ton, 32 -foot wide bituminous pavement <br />with concrete curb and gutter and routine drainage. The above property shall be assessed for <br />this type of roadway even if the width or strength is greater. <br />2) All tax - exempt property regardless of zoning class, such as, but not no necessarily limited to <br />schools, churches, parks, and government land, shall be assessed on a front footage basis at <br />50% of the cost of a 7 -ton, 32 -foot wide pavement with concrete curb and gutter and routine <br />drainage. The above property will be assessed for this type of roadway even if the width or <br />strength is greater. <br />3) All property not covered in the above description shall be assessed on a front footage basis at <br />50% of the cost for improvements to the roadway that they abut. <br />In addition to the costs above, all property may be assessed a proportional share on a footage basis <br />for expenses such as right -of -way and easement acquisition needed for that segment of the project <br />including any roadways abutting the property. <br />Page I <br />
The URL can be used to link to this page
Your browser does not support the video tag.