My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION 04292008
StAnthony
>
City Council
>
City Council Work Session
>
2008
>
CC WORKSESSION 04292008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 3:26:21 PM
Creation date
7/2/2019 3:26:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALLEYS <br />Alley reconstruction or overlays shall be assessed at 100% on a front footage basis to the abutting <br />properties. <br />CONDOMINIUMS <br />Assessments shall be spread by dividing them according to the percentage of interest in common <br />elements of the street improvements. <br />MUNICIPAL STATE AID ROADWAYS <br />Assessments on Municipal State Aid roadways shall be levied against the benefited properties on <br />the same basis as other public streets. <br />Municipal State Aid finding provided for reconstruction of a particular segment of street will be <br />used by the City to fund non - assessed costs, and will not be used to reduce assessments to the <br />properties adjacent to these facilities. <br />STORM DRAINAGE <br />Improvement costs for storm drainage shall be paid for wholly out of the storm drainage utility fund <br />and not assessed to benefited properties. <br />SANITARY SEWER & WATER MAIN <br />Improvement costs for sanitary sewer and water main improvements shall be paid for wholly out of <br />their respective utility funds and not assessed to benefited properties. New service lines for <br />individual properties shall be assessed at 100% of actual costs. Water service line replacement costs <br />shall include the installation of new curb stops and curb boxes, or new gate valves, depending on the <br />size of the water service. <br />SIDEWALKS <br />Sidewalk replacement as part of street reconstruction projects shall be assessed to all properties <br />abutting the project at the same rate as for street reconstruction, subject to front footage requirements <br />outlined within this policy. <br />New sidewalk installation performed as part of the City's Comprehensive Plan shall not be assessed <br />to adjacent property owners. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.