My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 08052019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 08052019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 9:41:03 AM
Creation date
8/1/2019 9:40:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 <br />CITY OF ST. ANTHONY VILLAGE <br />ASSESSMENT POLICY <br /> <br />Updated August 2019 <br /> <br />ASSESSMENT PERIOD <br /> <br /> Sanitary Sewer 10 years <br /> Water Main 10 years <br /> Storm Sewer 10 years <br /> Street Construction 10 years <br /> Street Resurfacing 10 years <br /> Sidewalks 10 years <br /> <br />For multiple improvement types that occur as part of the same project, the assessment shall be <br />15 years. No assessment for a single improvement shall exceed 10 years. <br /> <br />The following sets forth the City’s general assessment policies, but these policies may be <br />modified to the extent necessary to result in special assessment amounts which do not exceed <br />the special benefits to the respective properties being assessed, unless greater assessments <br />have been agreed to by the owners impacted by the proposed improvements. <br /> <br />UPGRADING OF PUBLIC ROADWAYS <br /> <br />For reconstruction of existing roadways, the City’s policy is to replace the existing surface, <br />whether concrete or bituminous, with bituminous roadways and concrete curb and gutter. <br /> <br />For street reconstruction, 35% of the cost for a project will be obtained from sources other than <br />ad valorem taxes. For street overlay, 50% of the cost for a project will be obtained from <br />sources other than ad valorem taxes. <br /> <br />All property will be assessed on a basis of front footage as specified below. <br /> <br />1) Non tax-exempt property zoned R-1, R-1A, R-2, and R-3 shall be assessed a minimum of <br />35%, and the overlay 50%, of the actual cost for a 7-ton, 32-foot wide bituminous pavement <br />with concrete curb and gutter and routine drainage. The above property shall be assessed <br />for this type of roadway even if the width or strength is greater. <br />2) All tax-exempt property regardless of zoning class, such as, but not no necessarily limited to <br />schools, churches, parks, and government land, shall be assessed on a front footage basis at <br />50% of the cost of a 7-ton, 32-foot wide pavement with concrete curb and gutter and <br />routine drainage. The above property will be assessed for this type of roadway even if the <br />width or strength is greater. <br />3) All property not covered in the above description shall be assessed on a front footage basis <br />at 50% of the cost for improvements to the roadway that they abut. <br />
The URL can be used to link to this page
Your browser does not support the video tag.