My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC WORKSESSION PACKET 08052019
StAnthony
>
City Council
>
City Council Work Session
>
2019
>
CC WORKSESSION PACKET 08052019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 9:41:03 AM
Creation date
8/1/2019 9:40:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br />In addition to the costs above, all property may be assessed a proportional share on a footage <br />basis for expenses such as right-of-way and easement acquisition needed for that segment of <br />the project including any roadways abutting the property. <br /> <br />ALLEYS <br />Alley reconstruction or overlays shall be assessed at 100% on a front footage basis to the <br />abutting properties. <br /> <br />CONDOMINIUMS <br />Assessments shall be spread by dividing them according to the percentage of interest in <br />common elements of the street improvements. <br /> <br />MUNICIPAL STATE AID ROADWAYS <br />Assessments on Municipal State Aid roadways shall be levied against the benefited properties <br />on the same basis as other public streets. <br /> <br />Municipal State Aid funding provided for reconstruction of a particular segment of street will be <br />used by the City to fund non-assessed costs and will not be used to reduce assessments to the <br />properties adjacent to these facilities. <br /> <br />STORM DRAINAGE <br /> <br />Improvement costs for storm drainage shall be paid for wholly out of the storm drainage utility <br />fund and not assessed to benefited properties. <br /> <br />SANITARY SEWER & WATER MAIN <br /> <br />Improvement costs for sanitary sewer and water main improvements shall be paid for wholly <br />out of their respective utility funds and not assessed to benefited properties. New service lines <br />for individual properties shall be assessed at 100% of actual costs. Water service line <br />replacement costs shall include the installation of new curb stops and curb boxes, or new gate <br />valves, depending on the size of the water service. <br />Improvement costs for sanitary sewer and water main line improvements located within City <br />right-of-way or City easement shall be paid for wholly out of their respective utility funds and <br />not assessed to benefited properties. <br /> <br />Repair, replacement, or installation of new water service lines for individual properties shall be <br />assessed at 100% of actual costs. Water service line improvement costs shall include the <br />installation of new service line pipe, corporation stops and/or fittings, curb box shut off, and/or <br />new gate valves, depending on the size of the water service. Property owners may petition the <br />City to include the cost of water service line repair or replacement work from the property line <br />to home into their assessment on adjacent infrastructure improvement projects. <br /> <br />Repair or replacement of sanitary sewer service lines for individual properties located within <br />City right-of-way or City easement shall be paid for wholly out of the respective utility fund and <br />not assessed to benefited properties. Property owners may petition the City to include the cost
The URL can be used to link to this page
Your browser does not support the video tag.