While trenching work can be done in frozen ground and it would be possible to place the drain tile <br />and backfill the trenches the risk of damageing irrigation lines and control wires is a potential <br />problem. <br />Plan Modifications <br />Though, we have provided Veit with a grading plan for the varsity field we still need to address the <br />ditch between the ball field and the practice field. Veit has expressed a concern over doing piece- <br />meal work and would like to have a plan which addresses all issues related to earthwork and grading <br />to minimize their mobilizations to the site. We also need to determine the relative costs for this work <br />and determine who is going to pay for these corrective measures. Additionally, the drainage swale <br />between the practice field and the Varsity Baseball field will reduce the width of the practice area <br />from 195 feet to approximately 180 feet. The narrower width was approved by Gary Palm the <br />Atheletic Director. This modification should allow us to provide a dainage swale that will stop most <br />off -site drainage on to the Varsity field. <br />Prior to the December 2, 2002 Veit had stripped the rejected topsoil from the practice field and had <br />begun to bring in replacement soil, this soil had not been screened and had pieces of brick and other <br />construction debris within its contents. They ceased operations and nothing has been done to date <br />to correct this matter. <br />Varsity Field Backstop <br />`D' Fence will begin adding the extension to the varsity field backstop. That work will probably <br />occur this week. They couldn't do this work earlier because they couldn't get their lift onto the <br />field and because they hadn't gotten the extension approved. This work was not in the original <br />plans but should have been. Despite that, the original bid would have included the cost for more <br />fence fabric and the City would have been paying for it anyway. <br />Hockey Rink & Basketball Court <br />URS will re -issue the drawings of the hockey boards and basketball court by December 20. The <br />only issue we have found on the basketball court layout is the striping. There should not be any <br />corrective cost's associated with these changes to the basketball court. Veit's subcontractor `D' <br />Fence is working on the fencing around the hockey rink this week. The changes to the boards <br />will be completed in this winter or next spring. The changes will include covering the existing <br />boards with pressure treated plywood and some changes to the player door's. URS is planning <br />on paying for the changes to the hockey boards. <br />Corrective Costs <br />It was interesting to note that a member of the City Council was present and he seemed to indicate <br />that the Park Board group has made some decisions on other projects which have cost additional <br />monies and that they really had no right to make these decisions and that they were actually a matter <br />