Laserfiche WebLink
06/22/99 11:08 FAX 6123701378 BRW, INC. Z 004/005 <br />,'i"7 B RW <br />uaour <br />To: Dennis Arrigoni, <br />Arrigoni Brothers <br />Fax: (651)645-9322 <br />Copy: Jay Hartman, City of <br />St. Anthony <br />Fax: (612)781-9323 <br />Bob Kost, BRW <br />From: Auggie Wong, RLA• <br />Date: June 22, 1999 <br />Subject: Water Tower Park Field Report #5 <br />Weather: 70 degree, Sunny <br />Time: 2:10 P.M <br />Date: June 22, 1999 <br />Percent Complete: 45% <br />MEMORANDUM <br />BRW <br />Thresher Square <br />700 Third Street South <br />Minneapolis, MN 55415 <br />Phone: (612) 370-0700 <br />Fax: (612)370-1378 <br />File: 35185 <br />Field Notes: <br />1. Basketball Court wall is complete. Additional fill was needed to bring area to final grade. <br />Asphalt for basket ball is going to be installed this week. <br />2. Playground retaining wall is 80% complete. However resetting of blocks at two locations <br />at around P8 and P6 are required since fust installation showed imperfections and <br />unacceptablc. <br />3. Work completed to date included parts of concrete sidewalk, concrete around 1 tree, long <br />retaining wall, basketball wall, excavation, removals (most) of excavation material. <br />4. Work underway include forming sidewalk edge, compacting basketball fill area, and <br />minor earth moving. <br />Issues: <br />1. To save existing tree at P23, wall adjustment is required. <br />2. Basketball court depth. <br />