My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 07121999
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
1999
>
PK PACKET 07121999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 8:04:04 AM
Creation date
8/7/2019 8:04:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/22/99 11:09 FAX 6123701378 BRW, INC. 10005/005 <br />Field Notes #4 <br />Page 2 <br />Action: <br />1. Wall at P23 was field adjusted by Auggie Wong and Gordy in order to save tree as <br />well as to maintain a smooth transition with the long retaining wall. Additional wall <br />at P22 may be needed to complement wall at P12. Wall at P78 was also adjusted to <br />be consistent with P23. Instead of a radius the wall will be straight at P23 and along <br />sidewalk at P78. <br />2. Auggie Wang confirmed the basketball court asphalt depth of 6" gravel base, 11/219 <br />wear course and 2" base course. <br />3. Dennis Arrigoni to clear earth at driveway and reinstall erosion control fence. <br />End of Field Notes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.