My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 05101999
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
1999
>
PK PACKET 05101999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 9:06:42 AM
Creation date
8/7/2019 9:06:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Don and Diane Skrivseth <br />Silver Point Park Improvement Project <br />WSB Project No. 1065.31 <br />April 16, 1999 <br />Page 2 <br />IV. Hockey Rink <br />Any proposed hockey rink for Silver Point Park will be a portable system which will <br />need to be removed in the Spring and installed in the Fall by City Crews. Fencing <br />behind the hockey goals in the rink will most likely be provided to protect <br />individuals from errant hockey pucks. Furthermore, Silver Point Park hockey and <br />skating rink areas are accessible to City Staff for plowing and flooding of rinks. <br />V. Emergency and Maintenance Accessibility to the Park <br />Emergency vehicles will have access to Silver Point Park from the parking lot area. <br />In addition, NSP has reviewed the project, and no comments or concerns were issued <br />by NSP regarding access to maintain their utilities. <br />VI. Walking Path <br />The trail being constructed within Silver Point Park will be an eight foot -wide black- <br />top trail. This black -top trail should not be compared to the trail located along Silver <br />Lake Boulevard. The Silver Lake Boulevard pathway was a retrofit installation <br />which has been affected by the existing soils and the presence of tree roots within the <br />pathway. The Silver Point Park trail will not be placed immediately adjacent to <br />fences around Silver Point Park but will meander its way up and down the slopes of <br />the park at mild grades in conformance with Federal Disability and Access Laws. <br />VII. Park Users <br />The baseball fields are designed for children 12 years of age and younger. The <br />playground equipment will accommodate children up to age five. In addition, the <br />basketball court, recreational skating and hockey rink will accommodate all ages. <br />VIII. Personal Items <br />NSP has visited the project site to look at the wooden pole located near your <br />backyard. To date NSP has not given any indication as to what they propose <br />to do with this pole, but we have requested that it be removed if it is not <br />essential to their operations. <br />F:\ W P W ❑V\ 1065.31 \041699.ds.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.