Laserfiche WebLink
A DAMES & MOORE GROUP COMPANY <br />Mike Morrison <br />November 12, 1998 <br />Page 3 <br />Award Construction Contract** <br />Construction Inspection ** <br />** Construction related services are not included in the fee estimate. They vary in cost based <br />upon the scope of involvement. Typically, a full service scope of construction <br />administration, layout, staking and inspection runs between 7% and 9% of the final <br />construction contract price. We will be better able to quote a fee for this work following the <br />final design stage and with more input from the public works director. <br />Schedule and Meetings <br />We estimate the entire process will take approximately 3 to 4 months. We propose to finalize the <br />Phase One plans by the end of March, 1999 to allow bid letting in April and construction in May <br />and June. Surveying should begin as soon as possible to avoid problems caused by snow cover. <br />Regular review meetings, (1 per month) with the public works director and Parks Commission <br />will be part of the design and engineering process. <br />Fees <br />Task I, Field Surveying $ 5,000 <br />Tasks II - III $ 3,500 <br />Phase One Task IV 4,500 <br />Total $13,000 <br />Direct expenses would be billed additionally and would include such things as mileage, blue <br />printing, photocopying and color reproductions. We estimate that expenses will run <br />approximately $100. <br />Offices Worldwide <br />