My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 12141998
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
1998
>
PK PACKET 12141998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 9:06:57 AM
Creation date
8/7/2019 9:06:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A DAMES & MOORE GROUP COMPANY <br />Mike Morrison <br />November 12, 1998 <br />Page 3 <br />Award Construction Contract** <br />Construction Inspection ** <br />** Construction related services are not included in the fee estimate. They vary in cost based <br />upon the scope of involvement. Typically, a full service scope of construction <br />administration, layout, staking and inspection runs between 7% and 9% of the final <br />construction contract price. We will be better able to quote a fee for this work following the <br />final design stage and with more input from the public works director. <br />Schedule and Meetings <br />We estimate the entire process will take approximately 3 to 4 months. We propose to finalize the <br />Phase One plans by the end of March, 1999 to allow bid letting in April and construction in May <br />and June. Surveying should begin as soon as possible to avoid problems caused by snow cover. <br />Regular review meetings, (1 per month) with the public works director and Parks Commission <br />will be part of the design and engineering process. <br />Fees <br />Task I, Field Surveying $ 5,000 <br />Tasks II - III $ 3,500 <br />Phase One Task IV 4,500 <br />Total $13,000 <br />Direct expenses would be billed additionally and would include such things as mileage, blue <br />printing, photocopying and color reproductions. We estimate that expenses will run <br />approximately $100. <br />Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.