My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PK PACKET 12141998
StAnthony
>
Parks & Planning Commission
>
Parks and Environmental Commission Packets
>
1998
>
PK PACKET 12141998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2019 9:06:57 AM
Creation date
8/7/2019 9:06:57 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRW <br />A DAMES & MOORE GROUP COMPANY <br />Mike Momson <br />November 12, 1998 <br />Page 2 <br />II. Site Engineering and Design Development <br />• Translate conceptual playground and water tower park area plan to fit site survey / base <br />map. <br />• Prepare preliminary site grading plan for the water tower park area project. <br />• Prepare design sketches for decorative fencing, walkways and landscaping. <br />• Prepare refined site development cost estimate. <br />• Facilitate design review session with Parks Commission. <br />• Refine design and prepare colored plans and cross section graphics for depiction of <br />design development efforts to the Parks Commission and the community. <br />III. Final Phase One Park Plan and Site Engineering Documents <br />• Refine park plans based upon comments, suggestions, etc. <br />• Prepare construction documents for Phase One: plans, specifications and bid forms. <br />IV. Public Hearing, Advertisement for Bids and <br />Bid Letting <br />• Attend public hearing to present project, answer questions, etc. <br />• Assist the public works director in the preparation of advertisement for bids. <br />• Attend bid opening, review and tabulate bids. <br />Offices Worldwide <br />
The URL can be used to link to this page
Your browser does not support the video tag.