Laserfiche WebLink
Planning Commission Regular Meeting Minutes <br />August 20, 2019 <br />Page 4 <br /> <br />the proposed use is appropriate for the subject site. As part of the Preliminary Plan review, 1 <br />various conditions of approval are typically imposed. The Preliminary Plan is subject to a public 2 <br />hearing, review and recommendation by the Planning Commission and approval by the City 3 <br />Council. 4 <br /> 5 <br />The second stage is the Final PUD Plan which basically serves to implement the various 6 <br />conditions of Preliminary Plan approval and ensure that such conditions have been satisfied. The 7 <br />Final Plan will be subject to review and approval by the City Council. No public hearing is 8 <br />required for Final Plan. 9 <br /> 10 <br />City Planner Grittman noted in May of 2019, an Environmental Assessment Worksheet (EAW) 11 <br />was completed for the redevelopment project under consideration by the City. The purpose of the 12 <br />EAW process is to disclose information about potential environmental impacts of a project. 13 <br />Information disclosed in the EAW process is intended to determine whether a more detailed 14 <br />Environmental Impact Statement (EIS) is needed and to indicate how the project can be modified 15 <br />to lessen its environmental impacts. The EAW review considers the potential environmental 16 <br />impacts associated with the apartment building project, including issues associated with the 17 <br />demolition of the existing Walmart facilities. After receiving comments, the City Council 18 <br />adopted a resolution (Resolution 19-058) of “negative declaration” regarding the potential for 19 <br />significant environmental impacts. This action includes a series of mitigation steps that will be 20 <br />factored into project approval, and finds that no EIS is necessary. 21 <br /> 22 <br />City Planner Grittman stated the City’s draft 2040 Comprehensive Plan identifies the former 23 <br />Walmart site as a priority redevelopment opportunity. The City is expected to accommodate an 24 <br />increase in population and that little to no vacant land presently exists, redevelopment of 25 <br />previously developed sites is considered the primary means of achieving the City’s residential 26 <br />density objectives. The proposed redevelopment project is considered consistent with the City’s 27 <br />2040 Comprehensive Plan. Regarding land use compatibility multi-family residential uses and a 28 <br />park border the subject site on the west, the proposed multi-family housing project will be 29 <br />contiguous to similar uses and therefore is considered generally compatible with surrounding 30 <br />uses (and not an isolated use). 31 <br /> 32 <br />City Planner Grittman explained that primary access to the subject site is to be provided from the 33 <br />east via Silver Lake Road. The access previously utilized by Walmart is to be retained. Access to 34 <br />a surface parking lot in the northwest corner of the site is to be provided indirectly from 39th 35 <br />Avenue NE through an abutting commercial property. As a condition of the Final PUD approval, 36 <br />an assurance should be made that an access easement is in place to accommodate the northerly 37 <br />access to the subject site. Proof of such access easement should be provided to the City. Access-38 <br />related issues should be subject to further comment and recommendation by the City Engineer. 39 <br /> 40 <br />City Planner Grittman stated the site and building layout are considered well-conceived and 41 <br />respectful of the site’s context. The two proposed apartment buildings are situated in a manner 42 <br />which creates an internal court area which is provided a connection to the existing park and 43 <br />multi-family residential uses to the west. The proposed apartment buildings serve to buffer the 44 <br />interior court area from higher intensity commercial uses which exist to the north and east of the 45 <br />site and the fail line located to the south. 46