My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 02262020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 02262020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2020 8:57:56 AM
Creation date
2/20/2020 8:56:17 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Engineer Justin Messner stated Doran SLV, LLC has submitted an application to re-plat a 1 <br />portion of the Silver Lake Village plat. The resolution vacates the existing drainage and utility 2 <br />easement as recorded on the original Silver Lake Village plat. 3 <br /> 4 <br />Councilmember Jenson thought it made sense because the building will overlap on top of a 5 <br />portion of the sewer line. When will the construction take place once the easement is vacated 6 <br />and the sewer line is moved. City Engineer Messner explained the developer indicated 7 <br />demolition will begin in early spring and at the time of that the storm sewer will be relocated and 8 <br />be a part of the construction on the project. 9 <br /> 10 <br />Mayor Stille indicated if this is not approved then the project will not happen because no one 11 <br />will build on top of a pipe or easement. City Engineer Messner indicated that was correct. 12 <br /> 13 <br />Mayor Stille opened the public hearing at 7:05 p.m. 14 <br /> 15 <br />Mr. Christian, owner of Carbone’s Pizza, thought this will be quite well for his business. He 16 <br />asked what the timelines will be. City Manager Casey explained the City is still waiting for 17 <br />permits to come in but the first permit to come in would be a demo permit and the City has not 18 <br />received that yet. He noted all of the information will be on the City’s website and updates will 19 <br />be provided on a regular basis. 20 <br /> 21 <br />Mr. Dan Kuntz, member of the community, asked if the developer intended on having a 22 <br />temporary drainage plan between the demolition and the rebuild. City Engineer Messner 23 <br />explained the way the existing storm sewer is set up the developer plans on constructing a new 24 <br />storm sewer leaving the old storm sewer in place and live and then make the connection and 25 <br />remove the old storm sewer. 26 <br /> 27 <br />City Manager Casey indicated throughout the entire project it will be overseen by City Engineer 28 <br />Messner’s staff to make sure everything is in compliance with both City Code and also State 29 <br />Laws. 30 <br /> 31 <br />There being no additional public input, Mayor Stille closed the public hearing at 7:08 p.m. 32 <br /> 33 <br /> 34 <br />Motion by Councilmember Jenson, seconded by Councilmember Randle, to approve Resolution 35 <br />20-011; a Resolution approving application from Doran SLV, LLC for the vacation of all those 36 <br />drainage and utility easements, originally dedicated on the recorded plat of Silver Lake Village. 37 <br /> 38 <br />Motion carried 5-0. 39 <br /> 40 <br />V. REPORTS FROM COMMISSION AND STAFF – NONE. 41 <br /> 42 <br />VI. GENERAL BUSINESS OF COUNCIL. 43 <br /> 44 <br />A. Resolution 20-012; a Resolution Amending the City of St. Anthony’s Street Maintenance 45 <br />Agreement. 46 <br />2
The URL can be used to link to this page
Your browser does not support the video tag.