My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 02112020
StAnthony
>
City Council
>
City Council Minutes
>
2020
>
CC MINUTES 02112020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2020 8:48:45 AM
Creation date
2/27/2020 8:48:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />February 11, 2020 <br />Page 2 <br />1 City Engineer Justin Messner stated Doran SLV, LLC has submitted an application to re -plat a <br />2 portion of the Silver Lake Village plat. The resolution vacates the existing drainage and utility <br />3 easement as recorded on the original Silver Lake Village plat. <br />4 <br />5 Councilmember Jenson thought it made sense because the building will overlap on top of a <br />6 portion of the sewer line. When will the construction take place once the easement is vacated <br />7 and the sewer line is moved. City Engineer Messner explained the developer indicated <br />8 demolition will begin in early spring and at the time of that the storm sewer will be relocated and <br />9 be a part of the construction on the project. <br />10 <br />11 Mayor Stille indicated if this is not approved then the project will not happen because no one <br />12 will build on top of a pipe or easement. City Engineer Messner indicated that was correct. <br />13 <br />14 Mayor Stille opened the public hearing at 7:05 p.m. <br />15 <br />16 Mr. Christian, owner of Carbone's Pizza, thought this will be quite well for his business. He <br />17 asked what the timelines will be. City Manager Casey explained the City is still waiting for <br />18 permits to come in but the first permit to come in would be a demo permit and the City has not <br />19 received that yet. He noted all of the information will be on the City's website and updates will <br />20 be provided on a regular basis. <br />21 <br />22 Mr. Dan Kuntz, member of the community, asked if the developer intended on having a <br />23 temporary drainage plan between the demolition and the rebuild. City Engineer Messner <br />24 explained the way the existing storm sewer is set up the developer plans on constructing a new <br />25 storm sewer leaving the old storm sewer in place and live and then make the connection and <br />26 remove the old storm sewer. <br />27 <br />28 City Manager Casey indicated throughout the entire project it will be overseen by City Engineer <br />29 Messner's staff to make sure everything is in compliance with both City Code and also State <br />30 Laws. <br />31 <br />32 There being no additional public input, Mayor Stille closed the public hearing at 7:08 p.m. <br />33 <br />34 <br />35 Motion by Councilmember Jenson, seconded by Councilmember Randle, to approve Resolution <br />36 20-011; a Resolution approving application from Doran SLV, LLC for the vacation of all those <br />37 drainage and utility easements, originally dedicated on the recorded plat of Silver Lake Village. <br />38 <br />39 Motion carried 5-0. <br />40 <br />41 V. REPORTS FROM COMMISSION AND STAFF — NONE. <br />42 <br />43 VI. GENERAL BUSINESS OF COUNCIL. <br />44 <br />45 A. Resolution 20-012; a Resolution Amending the City of St. Anthony's Street Maintenance <br />46 Agreement. <br />
The URL can be used to link to this page
Your browser does not support the video tag.