Laserfiche WebLink
2019 Annual Report • Public Works Department • St. Anthony Village, Minnesota <br /> <br /> <br /> <br />12 <br /> <br />2020 STREET & UTILITY PROJECTS <br />The City is proposing to reconstruct the roadway and the utilities in 32nd Ave from Rankin Rd to <br />Croft Dr, Croft Dr from 32nd Ave to 31st Ave, and Silver Lake Terrace. This project will include <br />replacing the sanitary sewer, storm sewer, and watermain and is proposed to begin in the <br />spring of 2020. Additionally, the road surface of Silver Lane from Silver Lake Road to Stinson <br />Blvd is scheduled to undergo a mill and overlay in the spring of 2021 as part of this project. <br /> <br />