My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08112020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 08112020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2020 3:53:42 PM
Creation date
8/6/2020 3:33:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report <br />2021 Street and Utility Improvement Project <br />City of St. Anthony Village <br />WSB Project No. 015900-000 PAGE 9 <br />4.3 CHANDLER DRIVE AND FOSS ROAD SANITARY SEWER IMPROVEMENTS <br /> <br />Based on the drawdown tests performed, the Foss Road lift station firm pumping capacity (the capacity of <br />the station with its largest pump out of service), is 1,014 gpm. The post-development peak hourly flow for <br />the Silver Lake Village Area is 1,195 gpm. The firm pumping capacity should equal or exceed the peak <br />hourly sanitary flow of the Silver Lake Village Area post development. Improvements to the lift station to <br />accommodate the Silver Lake Vilage Area development include replacing the lower capacity pump with a <br />1,400 gpm to 1,500 gpm pump. <br /> <br />In addition, the undersized segment of sanitary sewer along Chandler Drive is proposed to be replaced <br />with the improvement ptoject to provide adequate capicaity for the Silver Lake Village Area development. <br />The proposed Chandler Drive and Foss Road sanitary sewer improvements are shown on Figure 7 in <br />Appendix A. <br /> <br /> <br />46
The URL can be used to link to this page
Your browser does not support the video tag.