Laserfiche WebLink
<br /> <br />Feasibility Report <br />2021 Street and Utility Improvement Project <br />City of St. Anthony Village <br />WSB Project No. 015900-000 PAGE 10 <br />5. FINANCING <br /> <br />5.1 OPINION OF PROBABLE CONSTRUCTION COST <br /> <br />A detailed breakdown of the Cost Opinion for the proposed project is included in Appendix B. The opinion <br />of cost incorporates the construction costs experienced during 2018, 2019 and 2020, and includes a 5% <br />contingency factor. Administrative costs are projected at 25% of the construction cost and include <br />engineering, legal, financing, and other administrative costs. A summary of the project cost is as follows: <br /> <br /> <br />5.2 FUNDING SOURCES <br /> <br />The total project cost is projected to be approximately $2.53 million. Funding for the project will come <br />from the 429 Public Improvement Bonds and Special Assessments to benefiting properties. <br /> <br />The City’s policy for street assessment is based on per unit along improved roads. For road <br />reconstruction projects along single family residential (R1) zones, the property owner is assessed 35% of <br />total street and local drainage construction costs. Each property owner that receives a new water service <br />will be assessed 100% of the actual service cost. The proposed assessed parcels for the road <br />reconstruction and mill and overlay improvements of the 2021 Street and Utility Improvement Project are <br />shown on Figure 2 and Figure 3 in Appendix A. The proposed assessments are shown in Appendix C. <br /> <br /> <br /> <br /> <br />Proposed Improvements Total Cost <br />Total Street Improvements $825,100.00 <br />Total Sanitary Sewer Improvements $164,500.00 <br />Total Water Main Improvements $222,500.00 <br />Total Storm Sewer Improvements $145,500.00 <br />Total Mill and Overlay Improvements $990,300.00 <br />Total Chandler Drive and Foss Road Sanitary Sewer Improvements $185,600.00 <br />Total Proposed Improvements $2,533,500.00 <br />2021 STREET AND UTILITY IMPROVEMENTS <br />City of Saint Anthony Village, Minnesota <br />Opinion of Probable Cost <br />Proposed Improvements Assessments City Cost Total <br />Total Street Improvements $165,780.00 $659,320.00 $825,100.00 <br />Total Sanitary Sewer Improvements $0.00 $164,500.00 $164,500.00 <br />Total Water Main Improvements $25,730.00 $196,770.00 $222,500.00 <br />Total Storm Sewer Improvements $50,900.00 $94,600.00 $145,500.00 <br />Total Mill and Overlay Improvements $349,980.00 $640,320.00 $990,300.00 <br />Total Chandler Drive and Foss Road Sanitary Sewer Improvements $0.00 $185,600.00 $185,600.00 <br />Total Proposed Improvements $592,390.00 $1,941,110.00 $2,533,500.00 <br />2021 STREET AND UTILITY IMPROVEMENTS <br />Funding Summary <br />City of Saint Anthony Village, Minnesota <br />47