My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10272020
StAnthony
>
City Council
>
City Council Packets
>
2020
>
CC PACKET 10272020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2020 5:53:48 PM
Creation date
10/22/2020 5:51:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 27, 2020 <br />Page 2 <br /> <br /> <br />3) Parking Supply. A parking supply of less than 2 spaces per unit as imposed in the R-4 <br />zoning district. A total of 46 parking spaces are proposed which results in a ratio of 1.2 <br />spaces per unit. This number is equal to the total number of bedrooms proposed in <br />the project. <br /> <br />4) Covered (Enclosed) Parking. The allowance of no covered (enclosed) parking stalls. <br />The City’s R-4 District standard requires at least half of all parking stalls to be <br />covered/enclosed. <br /> <br />5) Impervious Surface Coverage. The allowance of impervious surface coverage which <br />exceeds 50 percent of the area of the site (as imposed in the R-4 zoning district). The <br />proposed site plan calls for 76.7 percent of the site to be devoted to impervious <br />surface. <br /> <br />Planning Commission Action. <br />The Planning Commission considered this item at its August 16th meeting as a part of a public <br />hearing on the request. A motion to approve the item was seconded, but failed to prevail, with <br />the vote split at 2 in favor, 2 opposed, and 3 members abstaining. The votes opposed raised as <br />primary issues a concern over parking supply, the concern with converting potential <br />commercial property to residential, and a concern over the lack of attention to racial justice. <br /> <br />Abstention votes primarily cited the inability to ensure that the applicant’s primary project <br />asset – affordability – was a guarantee, but instead only a goal of the project. The applicant <br />noted that the proposal was essentially “market rate”, in that it is being designed to succeed <br />financially by attracting tenants who are willing to accept lower levels of amenities in exchange <br />for lower rents. The primary support for ensuring the lower rents was the applicant’s <br />contention that unit size and the lack of amenities would not attract tenants at higher rent <br />levels. <br /> <br />The Planning Commission declined to take up a second motion, and forwards the application to <br />the City Council without a final recommendation. <br /> <br />Staff Recommendation. <br />Since the Planning Commission’s review, the applicant has submitted updated exterior plans, <br />reflecting additional detail in the window areas (showing the HVAC units), and altering the color <br />scheme slightly, particularly lightening the wood material from a dark grey-brown to a medium <br />brown color. Otherwise, the current submission is the same as that reviewed by the Planning <br />Commission. It should be noted that exterior building colors were not raised as an issue by the <br />Commission. <br /> <br /> <br />32
The URL can be used to link to this page
Your browser does not support the video tag.