My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020 Public Works Department Annual Report
StAnthony
>
Administration
>
Annual Reports
>
Public Works Annual Reports
>
2020 Public Works Department Annual Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 4:45:35 PM
Creation date
3/4/2021 4:45:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Annual Report • Public Works Department • St. Anthony Village, Minnesota <br /> <br /> <br /> <br />10 <br /> <br />2020 STREET & UTILITY PROJECT <br />Infrastructure Improvements Completed In 2020 Include: <br />The City completed the street and utility improvements identified within this project on 32nd <br />Avenue NE, Croft Drive, and Silver Lake Terrace, including bituminous base course paving, <br />water main and water service replacements, and sewer main and sewer service replacements. <br />As part of the project, Silver Lane from Silver Lake Road to Stinson Boulevard will be resurfaced <br />with a mill and overlay at the same time as the final wear course paving on the remainder of the <br />project. Tree replacements and continued turf restoration will be completed in the spring of <br />2021. Prior to final wear course paving there will be an inspection of all pavement, trees, <br />utilities, and turf establishment completed as a part of this project. There is a two year warranty <br />with all restoration items as part of this project. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.