My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020 Public Works Department Annual Report
StAnthony
>
Administration
>
Annual Reports
>
Public Works Annual Reports
>
2020 Public Works Department Annual Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2021 4:45:35 PM
Creation date
3/4/2021 4:45:16 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2020 Annual Report • Public Works Department • St. Anthony Village, Minnesota <br /> <br /> <br /> <br />11 <br /> <br />2021 STREET & UTILITY PROJECTS <br />The City is proposing to reconstruct the roadway and the utilities in Skycroft Dr from 32nd Ave <br />NE to 33rd Ave NE and Croft Dr from 32nd Ave NE to 33rd Ave NE. This project will include <br />replacing the sanitary sewer, storm sewer, and watermain and is proposed to begin in the <br />spring of 2021. Included in the project is the mill and overlay resurfacing of St. Anthony Blvd <br />and 29th Ave NE both from Silver Lake Road to Stinson Blvd; as well as 31st Ave NE from <br />Rankin Rd to Croft Dr and Croft Dr from Rankin Rd to 31st Ave NE. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.