Saint Anthony Village Lowry Grove Redevelopment TIF District
<br />Replacement Cost Report
<br />Square Foot Cost Estimate Report Date:11/11/2017
<br />Lowry Laundromat
<br />City of St Anthony
<br />2501 Lowry Ave NE , St Anthony , Minnesota ,
<br />55418
<br />Building Type:Laundromat Concrete Block / Bearing Walls
<br />Location:ST ANTHONY, MN
<br />Story Count:1
<br />Story Height (L.F.):10
<br />Floor Area (S.F.):2800
<br />Labor Type:OPN
<br />Basement Included:No
<br />Data Release:Year 2018
<br />Cost Per Square Foot:$117.66
<br />Building Cost:$329,434.85
<br />% of Total Cost Per S.F. Cost
<br />15.08% 16.12 45,149.76
<br />A1010 Standard Foundations 9.50 26,604.89
<br />6.35 17,770.32
<br />3.16 8,834.57
<br />A1030 Slab on Grade 6.08 17,031.53
<br />6.08 17,031.53
<br />A2010 Basement Excavation 0.54 1,513.34
<br />0.54 1,513.34
<br />28.05% 30.00 84,001.99
<br />B1020 Roof Construction 3.88 10,864.00
<br />3.88 10,864.00
<br />B2010 Exterior Walls 9.34 26,152.00
<br />9.34 26,152.00
<br />B2020 Exterior Windows 3.67 10,276.12
<br />2.04 5,721.63
<br />1.63 4,554.49
<br />B2030 Exterior Doors 3.49 9,770.75
<br />2.40 6,713.30
<br />1.09 3,057.45
<br />B3010 Roof Coverings 9.62 26,939.12
<br />3.14 8,794.83
<br />Concrete block (CMU) wall, regular weight, 75% solid, 4 x 8 x 16, 2000 PSI
<br />Estimate Name:
<br />Costs are derived from a building model with basic components.
<br />Scope differences and market conditions can cause costs to vary significantly.
<br />A Substructure
<br />Foundation wall, CIP, 4' wall height, direct chute, .148 CY/LF, 7.2 PLF, 12"
<br />thick
<br />Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing capacity 6 KSF,
<br />12" deep x 24" wide
<br />Slab on grade, 5" thick, non industrial, reinforced
<br />Excavate and fill, 4000 SF, 4' deep, sand, gravel, or common earth, on site
<br />storage
<br />B Shell
<br />Wood roof, flat rafter, 2" x 10", 16" O.C.
<br />Aluminum flush tube frame, for 1/4"glass, 1‐3/4" x 4‐1/2", 5'x20' opening, 3
<br />intermediate horizontals
<br />Glazing panel, plate glass, 1/4" thick, clear
<br />Door, aluminum & glass, with transom, narrow stile, double door, hardware,
<br />6'‐0" x 10'‐0" opening
<br />Door, steel 18 gauge, hollow metal, 1 door with frame, "A" label, 3'‐0" x 7'‐0"
<br />opening
<br />Roofing, asphalt flood coat, gravel, base sheet, 3 plies 15# asphalt felt,
<br />mopped
<br />Saint Anthony Village Lowry Grove Redevelopment TIF District
<br />LHB Project No. 170752 Page 1 of 3
<br />Replacement Cost Report
<br />Parcel B Building 1, Laundromat and Shower
<br />47
|