Laserfiche WebLink
Saint Anthony Village Lowry Grove Redevelopment TIF District <br />Replacement Cost Report <br />Square Foot Cost Estimate Report Date:11/11/2017 <br />Lowry Laundromat <br />City of St Anthony <br />2501 Lowry Ave NE , St Anthony , Minnesota ,  <br />55418 <br />Building Type:Laundromat Concrete Block / Bearing Walls <br />Location:ST ANTHONY, MN <br />Story Count:1 <br />Story Height (L.F.):10 <br />Floor Area (S.F.):2800 <br />Labor Type:OPN <br />Basement Included:No  <br />Data Release:Year 2018 <br />Cost Per Square Foot:$117.66  <br />Building Cost:$329,434.85  <br />% of Total Cost Per S.F. Cost <br />15.08% 16.12 45,149.76 <br />A1010 Standard Foundations 9.50 26,604.89 <br />6.35 17,770.32 <br />3.16 8,834.57 <br />A1030 Slab on Grade 6.08 17,031.53 <br />6.08 17,031.53 <br />A2010 Basement Excavation 0.54 1,513.34 <br />0.54 1,513.34 <br />28.05% 30.00 84,001.99 <br />B1020 Roof Construction 3.88 10,864.00 <br />3.88 10,864.00 <br />B2010 Exterior Walls 9.34 26,152.00 <br />9.34 26,152.00 <br />B2020 Exterior Windows 3.67 10,276.12 <br />2.04 5,721.63 <br />1.63 4,554.49 <br />B2030 Exterior Doors 3.49 9,770.75 <br />2.40 6,713.30 <br />1.09 3,057.45 <br />B3010 Roof Coverings 9.62 26,939.12 <br />3.14 8,794.83 <br />Concrete block (CMU) wall, regular weight, 75% solid, 4 x 8 x 16, 2000 PSI <br />Estimate Name: <br />Costs are derived from a building model with basic components. <br />Scope differences and market conditions can cause costs to vary significantly. <br />A Substructure <br />Foundation wall, CIP, 4' wall height, direct chute, .148 CY/LF, 7.2 PLF, 12"  <br />thick <br />Strip footing, concrete, reinforced, load 11.1 KLF, soil bearing capacity 6 KSF,  <br />12" deep x 24" wide <br />Slab on grade, 5" thick, non industrial, reinforced <br />Excavate and fill, 4000 SF, 4' deep, sand, gravel, or common earth, on site  <br />storage <br />B Shell <br />Wood roof, flat rafter, 2" x 10", 16" O.C. <br />Aluminum flush tube frame, for 1/4"glass, 1‐3/4" x 4‐1/2", 5'x20' opening, 3  <br />intermediate horizontals <br />Glazing panel, plate glass, 1/4" thick, clear <br />Door, aluminum & glass, with transom, narrow stile, double door, hardware,  <br />6'‐0" x 10'‐0" opening <br />Door, steel 18 gauge, hollow metal, 1 door with frame, "A" label, 3'‐0" x 7'‐0"  <br />opening <br />Roofing, asphalt flood coat, gravel, base sheet, 3 plies 15# asphalt felt,  <br />mopped <br />Saint Anthony Village Lowry Grove Redevelopment TIF District <br />LHB Project No. 170752 Page 1 of 3 <br />Replacement Cost Report <br />Parcel B Building 1, Laundromat and Shower <br />47