Laserfiche WebLink
Saint Anthony Village Lowry Grove Redevelopment TIF District <br />Code Deficiency Cost Report <br />Parcel B Building 1 <br />2501 Lowry Ave NE St Anthony, MN 55418 - Laundromat and Shower Facility <br />Code Related Cost Items Unit Cost Units <br />Unit <br />Quantity Total <br />Accessibility Items <br />Parking <br />Code required ADA parking should be created 100.00$ EA 1 100.00$ <br />Building Entrance <br />Building entrance should be modified to code required access 1,000.00$ EA 1 1,000.00$ <br />Restroom <br />An ADA code compliant restroom should be created 12.46$ SF 2800 34,888.00$ <br />Shower Facility <br />An ADA code compliant shower should be created 5.65$ SF 2800 15,820.00$ <br />Door Hardware <br />Code required ADA door hardware should be installed 250.00$ EA 3 750.00$ <br />Structural Elements <br />-$ <br />Exiting <br />Vinyl Flooring <br />Damaged vinyl flooring should be replaced to create an <br />unimpeded means for emergency egress 2.42$ SF 2800 6,776.00$ <br />Fire Protection <br />Smoke Detectors <br />Install code required smoke detectors 1.07$ SF 2800 2,996.00$ <br />Emergency Lighting <br />Install code required emergency lighting 175.00$ EA 4 700.00$ <br />Emergency Notification System <br />Install code required emergency notification system 2.69$ SF 2800 7,532.00$ <br />Building Sprinkler system <br />Install code required building sprinkler system 6.74$ SF 2800 18,872.00$ <br />Exterior Construction <br />Windows <br />Replace damaged windows to prevent water intrusion per code 3.67$ SF 2800 10,276.00$ <br />Vinyl Siding <br />Repair damaged vinyl siding to prevent water intrusion per code 250.00$ Lump 1 250.00$ <br />Brick Chimney <br />Saint Anthony Village Lowry Grove Redevelopment TIF District <br />LHB Project No. 170752 Page 1 of 2 <br />Code Deficiency Cost Report <br />Parcel B Building 1, Laundromat and Shower <br />50