My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HRA PACKET 03232021
StAnthony
>
City Council
>
HRA Agenda Packets
>
2021
>
HRA PACKET 03232021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2021 9:26:43 AM
Creation date
4/9/2021 9:03:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.06 2,973.97 <br />2.17 6,078.70 <br />D5090 Other Electrical Systems 0.51 1,427.19 <br />0.51 1,427.19 <br />0%0 0 <br />E1090 Other Equipment 0 0 <br />0%0 0 <br />0%0 0 <br />100% $106.96 $299,486.23 <br />10.00% $10.70 $29,948.62 <br />0.00% $0.00 $0.00 <br />0.00% $0.00 $0.00 <br />$117.66 $329,434.85 <br />Generator sets, w/battery, charger, muffler and transfer switch, gas/gasoline <br />operated, 3 phase, 4 wire, 277/480 V, 7.5 kW <br />Communication and alarm systems, fire detection, addressable, 25 detectors, <br />includes outlets, boxes, conduit and wire <br />Fire alarm command center, addressable without voice, excl. wire & conduit <br />Architectural Fees <br />User Fees <br />Total Building Cost <br />E Equipment & Furnishings <br />F Special Construction <br />G Building Sitework <br />SubTotal <br />Contractor Fees (General Conditions,Overhead,Profit) <br />Saint Anthony Village Lowry Grove Redevelopment TIF District <br />LHB Project No. 170752 Page 3 of 3 <br />Replacement Cost Report <br />Parcel B Building 1, Laundromat and Shower <br />49
The URL can be used to link to this page
Your browser does not support the video tag.