Laserfiche WebLink
1.06 2,973.97 <br />2.17 6,078.70 <br />D5090 Other Electrical Systems 0.51 1,427.19 <br />0.51 1,427.19 <br />0%0 0 <br />E1090 Other Equipment 0 0 <br />0%0 0 <br />0%0 0 <br />100% $106.96 $299,486.23  <br />10.00% $10.70 $29,948.62  <br />0.00% $0.00 $0.00  <br />0.00% $0.00 $0.00  <br />$117.66 $329,434.85  <br />Generator sets, w/battery, charger, muffler and transfer switch, gas/gasoline  <br />operated, 3 phase, 4 wire, 277/480 V, 7.5 kW <br />Communication and alarm systems, fire detection, addressable, 25 detectors,  <br />includes outlets, boxes, conduit and wire <br />Fire alarm command center, addressable without voice, excl. wire & conduit <br />Architectural Fees <br />User Fees <br />Total Building Cost <br />E Equipment & Furnishings <br />F Special Construction <br />G Building Sitework <br />SubTotal <br />Contractor Fees (General Conditions,Overhead,Profit) <br />Saint Anthony Village Lowry Grove Redevelopment TIF District <br />LHB Project No. 170752 Page 3 of 3 <br />Replacement Cost Report <br />Parcel B Building 1, Laundromat and Shower <br />49