My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC MINUTES 05112021
StAnthony
>
City Council
>
City Council Minutes
>
2021
>
CC MINUTES 05112021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 2:33:48 PM
Creation date
5/27/2021 2:33:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />May 11,2021 <br />Page 3 <br />1 Mayor Stille encouraged the residents to sign up for the push notifications. Mill and overlay is <br />2 generally done after a road is reconstructed for 20 years. This would give the road 40 years at <br />3 which time another mill and overlay can be done to extend the road life to 60 years before a <br />4 reconstruction is needed. <br />5 <br />6 Motion by Councilmember Webster, seconded by Councilmember Jenson, to adopt Resolution <br />7 21-049; a Resolution Ordering Preparation of Feasibility Report for 2022 Street and Utility <br />8 Improvements. <br />9 <br />10 Motion carried 5-0. <br />11 <br />12 Mayor Stille asked for a 2021 Project Update from City Engineer Messner. Meetings are being <br />13 held with the contractor for a pre -construction meeting later this week. The construction should <br />14 begin in early June, based on previous discussions with the contractor. This project will progress <br />15 fairly quickly and should be completed by the end of July 2021. <br />16 <br />17 Mayor Stille asked when the final lift would be put on the segment of road for the 2020 Project. <br />18 Mr. Messner stated the contractor was there last week and replaced any of the curb and gutter <br />19 and any new concrete that cracked over the winter. Looking at milling Silver Lane next week. <br />20 Within the next week or two the entire project should be completed. Mayor Stille noted grass in <br />21 many places looked really good. Mr. Messner stated if there are any bare spots the contractor <br />22 will reseed. The turf will be continually monitored and repaired as necessary. There is a two- <br />23 year warranty on these projects. <br />24 <br />25 VII. REPORTS FROM CITY MANAGER AND COUNCIL MEMBERS. <br />26 <br />27 City Manager Yunker announced Jeremy Gumke will be the City's new Public Works Director. <br />28 <br />29 Councilmember Walker had nothing to report. <br />30 <br />31 Councilmember Randle had nothing to report. <br />32 <br />33 Councilmember Webster stated she participated in City Clean -Up along with the Mayor and <br />34 other Councilmembers. VillageFest is currently considering some options for the 2021 <br />35 celebration. Chad Gillard is the Villager of the Year for 2021. Saturday, May 15 at 9am she <br />36 invited residents to join Councilmember Jenson and herself for Coffee with the Council. <br />37 <br />38 Councilmember Jenson stated he attended the City Clean -Up Day. He also participated in the <br />39 Community Center COVID Vaccine Clinic last week as a greeter. <br />40 <br />41 Mayor Stille stated on May 10, he attended the Regional Council of Mayor with 17 Mayors <br />42 attending. The speaker was from Alliance on Alliances. Earlier today, he attended the MWMO <br />43 Board Meeting. <br />44 <br />45 VIII. COMMUNITY FORUM. <br />46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.