My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08102021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 08102021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 11:38:52 AM
Creation date
8/6/2021 11:37:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mill and Overlay Improvements: <br />•Crestview Drive from 31st Avenue NE to 29th Avenue NE <br />•Armour Terrace from Silver Lake Road to Crestview <br />•Bell Lane from Armour Terrace to Crestview Drive <br />•East Gate Road from Crestview Drive to Rankin Road <br />•Coolidge Street Alley from Murray Avenue to 29th Avenue NE <br />•Murray Avenue/St. Anthony Boulevard Alley from Wilson Street to Coolidge Street <br />•29th Avenue NE/St. Anthony Boulevard Alley bounded by 29th Avenue NE <br />•Roosevelt Street Alley bounded by St. Anthony Boulevard and Stinson Boulevard <br />The project areas are identified on Figure 1 in Appendix A of this report. <br />2.5 PROJECT HISTORY <br />This project was initiated through the continued development and implementation of the City of St. <br />Anthony Village Capital Improvement Plan (CIP). The CIP provides a schedule for the various roadway <br />improvements that are necessary to maintain the City streets in an effective and efficient manner. <br />The following conditions have been identified within the project area: <br />•Deterioration of street conditions <br />•Re-occurring water main breaks in the project limits <br />•Streets, sanitary sewer, water main lines are over 60 years old and exhibiting deterioration <br />problems <br />As a result, On May 11, 2021, the St. Anthony Village City Council authorized the preparation of an <br />engineering feasibility report for the 2022 Street and Utility Improvement Project. <br />36
The URL can be used to link to this page
Your browser does not support the video tag.