My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08102021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 08102021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 11:38:52 AM
Creation date
8/6/2021 11:37:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.INTRODUCTION <br />2.1 AUTHORIZATION <br />On May 11, 2021, the St. Anthony Village City Council authorized the preparation of an engineering <br />Feasibility Report for the 2022 Street and Utility Improvement Project. This project was authorized under <br />City of St. Anthony Village Resolution 21-049. <br />2.2 SCOPE <br />Improvements outlined within this report include reconstructing Rankin Road from 33rd Avenue NE to 31st <br />Avenue NE. Proposed improvements include road reconstruction complete with bituminous paving, <br />concrete curb and gutter, watermain and sanitary sewer replacement, and the installation of new storm <br />sewer and catch basins to improve area drainage. <br />The feasibility study also includes the review and cost analysis to mill and overlay the following roadways: <br />•Crestview Drive from 31st Avenue NE to 29th Avenue NE <br />•Armour Terrace from Silver Lake Road to Crestview <br />•Bell Lane from Armour Terrace to Crestview Drive <br />•East Gate Road from Crestview Drive to Rankin Road <br />•Coolidge Street Alley from Murray Avenue to 29th Avenue NE <br />•Murray Avenue/St. Anthony Boulevard Alley from Wilson Street to Coolidge Street <br />•29th Avenue NE/St. Anthony Boulevard Alley bounded by 29th Avenue NE <br />•Roosevelt Street Alley bounded by St. Anthony Boulevard and Stinson Boulevard <br />2.3 DATA AVAILABLE <br />Information and materials used in the preparation of this report include the following: <br />•City of St. Anthony Village Capital Improvement Plan (CIP) <br />•City of St. Anthony Village Record Drawings <br />•City of St. Anthony Village Topographic Maps <br />•Private Utility Maps <br />•Field observations of area <br />•Boring Logs, prepared by WSB, dated June 2021 <br />•Pavement Coring Forensic Report prepared by WSB, dated June 2021 <br />•City of St. Anthony Village Assessment Policy, modified in 2020 <br />2.4 PROJECT LOCATION <br />The project includes the following streets: <br />Street and Utility Improvements: <br />•Rankin Road from 33rd Avenue NE to 31st Avenue NE <br />35
The URL can be used to link to this page
Your browser does not support the video tag.