My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08102021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 08102021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 11:38:52 AM
Creation date
8/6/2021 11:37:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
select granular material or "sand cushion" will be placed on the geotextile fabric to provide a firm base <br />for the eight inches (8”) of Class 5 aggregate base and four inches (4”) of bituminous asphalt <br />pavement. <br />These streets will be replaced with bituminous asphalt pavement per City Council Resolution 07-022. <br />The decision was reached following the outcome of the Street Reconstruction Task Force report <br />presented on November 13, 2007. <br />The proposed typical section is shown on Figure 7 in Appendix A. <br />4.1.5 Permits and Approvals <br />Reconstruction of the roadways will disturb over one acre and will require a National Pollution <br />Discharge Elimination Systems (NPDES) General Storm Water Permit (MNR 100001) that must be <br />obtained by the City of St. Anthony Village from the Minnesota Pollution Control Agency (MPCA). <br />The reconstruction of the existing water main will require a permit from the Minnesota Department of <br />Health. <br />The reconstruction will also require a permit from the Rice Creek Watershed District (RCWD). This <br />may require stormwater treatment for the runoff from the project area. <br />4.1.6 Detour Routes <br />The project will require significant excavation and disposal of unacceptable material from the existing <br />street area and a supply of significant volumes of select granular base, aggregate base, and <br />bituminous pavement materials. This effort will require closing the roads under construction and <br />increasing loaded truck traffic on the streets adjacent to the construction area. Adequately signed <br />detours will be identified to direct traffic around the construction zones and notify users of the <br />increased truck and construction activity. To accommodate the property owners along the excavated <br />roads, temporary parking on the adjacent streets may be necessary during the periods when vehicle <br />access is not possible. <br />4.2 MILL AND OVERLAY IMPROVEMENTS <br />Mill and overlay improvements are a cost-effective maintenance strategy to extend the life cycle of the <br />roadway. Mill and overlay improvements are most effective when scheduled within 15 years of original <br />construction. <br />Due to the poor condition of the pavement and the age of the roadways, improvements along alleys <br />include milling the full depth of existing bituminous pavement, grading and compaction of the existing <br />aggregate, and installation of new bituminous pavement. Replacement of pavement will completely <br />remove the deteriorated pavement while utilizing the existing aggregate and sand sections. <br />40
The URL can be used to link to this page
Your browser does not support the video tag.