My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08102021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 08102021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 11:38:52 AM
Creation date
8/6/2021 11:37:49 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Improvements along Crestview Drive, Armour Terrace, Bell Lane, and East Gate Road include a 2” mill to <br />remove the wear course. A new 2-inch wear course will then be paved over the entire width of each street <br />to extend the pavement life of the roadway. There will be an additional ¼-inch of pavement that extends <br />above the toe of curb to keep the pavement above the curb as the road settles over time. <br />The proposed typical sections are shown on Figure 8 and Figure 9 in Appendix A. <br />To allow the contractor to complete the mill and overlay improvements timely and safely, roads will be <br />closed to through traffic (open to residents). <br />41
The URL can be used to link to this page
Your browser does not support the video tag.