My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09282021
StAnthony
>
City Council
>
City Council Packets
>
2021
>
CC PACKET 09282021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 9:38:18 AM
Creation date
1/20/2022 9:37:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />September 14, 2021 <br />Page 5 <br /> <br />Residential Districts as baselines. In summary, the Comprehensive Plan promotes the use of the 1 <br />subject properties that reflect the proposed uses of commercial and high-density multiple family 2 <br />residential uses of up to 40 units per acre. 3 <br /> 4 <br />The PowerPoint presentation included a map showing the locations, PUD considerations, site 5 <br />plans, bank building elevations, landscape/site plan, landscaped plaza, apartment building 6 <br />perspective, recommended conditions, and a review of the Preliminary Plan PUD process. 7 <br />Details of the elevation and floorplans were provided. Diagrams showing, land title topographic 8 <br />survey, preliminary plat, site plan, grading plan, erosion control plan, utility plan, landscape plan, 9 <br />and lighting plan were provided by the applicants. A Stormwater Management Summary for 10 <br />Bremer Bank site was received from the applicant on August 31, 2021. 11 <br /> 12 <br />The proposed PUD meets the requirements of the Zoning Ordinance for many of the baseline 13 <br />standards. The principal areas of flexibility under the PUD include: 14 <br /> 15 <br />(1) Building height (code is 35 feet/3 stories); applicant proposes approximately 56 feet to top of 16 <br />parapet and 4 stories. 17 <br />(2) Lot coverage/impervious surface (R-4 code limits this to 50%); applicant’s proposal is 18 <br />approximately 50.5%. 19 <br />(3) Density (R-4 code limits this to approximately 24 units per acre, Comprehensive Plan calls 20 <br />for 20-40 units per acre); applicant is proposing approximately 32-36 units per acre. 21 <br /> 22 <br />Staff believes that the flexibility requested under the PUD is appropriate, given the objectives of 23 <br />the Comprehensive Plan and the related improvements and amenities proposed as part of the 24 <br />project. Staff is recommending approval of the Preliminary Plan stage of the PUD Amendment 25 <br />for Bremer Bank at 2654 Kenzie Terrace and Interstate Development at 2410 Lowry Avenue 26 <br />NE, with a series of conditions as noted in the summary section below. Final resolution of the 27 <br />areas of conflict would be necessary as a part of the Final Plan PUD, however, the parking and 28 <br />stacking issues noted above may be best addressed as a part of the current Preliminary Plan 29 <br />application to avoid later confusion as to the City’s requirements. 30 <br /> 31 <br />The Site Plan Review Summary was provided regarding the Proposed Bank Facility at 2654 32 <br />Kenzie Terrace including features of the bank building, circulation, building materials, signage, 33 <br />landscaping, trash enclosure, and lighting, The Site Plan Review Summary for the Multi-Family 34 <br />Apartment Building at 2401 Lowry Avenue NE included features of the building, site access and 35 <br />parking, setbacks, building height, emergency vehicle access, building materials, landscaping, 36 <br />signage, trash handling, and grading, drainage and utilities. 37 <br /> 38 <br />As a condition of Final PUD approval, the applicant will be required to enter into a PUD 39 <br />agreement with the City and post all the necessary securities required by it. 40 <br /> 41 <br />The applicants have included a list of sustainability measures in their proposal. 42 <br /> 43 <br />City Staff and the Planning Commission recommend approval of the Preliminary Plan PUD with 44 <br />the following conditions: 45 <br /> 46 <br />9
The URL can be used to link to this page
Your browser does not support the video tag.