My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09202022
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2022
>
PL PACKET 09202022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 2:15:52 PM
Creation date
9/20/2022 2:14:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 20, 2022 <br />Page 3 <br />2.Analysis <br />Site Plan Review Summary <br />Proposed Bank Facility - 3800 Silver Lake Road <br />The new bank building would be approximately 3,803 square feet. The site currently has no <br />direct access to Silver Lake Road, and would take its access from an internal private street in the <br />Silver Lake PUD. The applicants will need to confirm access permission for the subject property, <br />which previously had been utilized as parking for the former Walmart facility. Moreover, when <br />the northerly portion of the site is ready for development, a plat and revised access easements <br />may be required as a part of those land use applications. <br />Circulation, Access, and Parking. Traffic entering the site would have access to parking along <br />the front entry portion of the building, as well as parking along the east (front) of the lot. This <br />southerly access point would also serve the drive-through lane that loops to the ATM window <br />on the west side of the building. A total of 31 parking spaces serve the building, a ratio of one <br />space per 123 square feet gross. The zoning ordinance requires at least one space per 300 <br />square feet. The proposal is easily consistent with this aspect of the code. <br />The drive-through gains its access from this southerly driveway. The drive-through appears to <br />have stacking space for as many as six to seven vehicles, with a “by-pass” lane for vehicles that <br />decide to leave the queue. For ATM-only service, this stacking amount should easily serve peak <br />use of the facility. The bank also includes a walk-up vestibule with additional ATM services as a <br />part of the main banking lobby.
The URL can be used to link to this page
Your browser does not support the video tag.