My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09202022
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2022
>
PL PACKET 09202022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 2:15:52 PM
Creation date
9/20/2022 2:14:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
September 20, 2022 <br />Page 4 <br />A second access drive is shown north of the building, connecting the private street to the north <br />portion of the bank driveway. In the northeast corner of the site, an internal driveway <br />connection would be made to the future development on the north portion of the subject <br />parcel. As noted, driveway easements would be required to ensure that all parcels have <br />continued access throughout the PUD area. <br />Building Materials. Building Materials area combination of primarily brick, glass, and cast <br />stone with metal panel accents. The building itself would be as high as 22 feet to the top of the <br />highest parapet, well under the maximum 35 foot building height. No issues with materials or <br />general design are evident. <br />Signage. No signage information has been included with the permit request. It should be <br />noted that under the general sign requirements, each freestanding business location is <br />permitted to have two signs, with total area based on the code requirements applied to the site <br />in question. Separate sign permitting will be a requirement for identification on the building. <br />Landscaping. The landscaping plan illustrates a fairly well landscaped site. Additional overstory <br />tree planting is shown along the west boundary adjoining the private street, and the remainder <br />of the site includes a variety of ornamental trees, shrubs, perennial plantings, and lawn. The <br />limits of construction appear to retain a row of existing trees along the common PUD driveway <br />along the south boundary of the site. <br />Trash Enclosure. The site plan also includes a detached trash enclosure facility in the <br />southwest corner of the site. The drawings appear to suggest bollard protection of the <br />enclosure, but details, materials, and other aspects of the enclosure are not identified. The <br />enclosure should be constructed of materials that reflect those used in the principal building. <br />Submission of plans verifying this requirement will be a condition of CUP approval. <br />3.Criteria for and Consistency with Criteria for PUD Approval. Title XV Land Usage, Chapter <br />152 Zoning Code, Section §152.209. <br />SUMMARY AND STAFF/PLANNING COMMISSION RECOMMENDATIONS <br />Conditional Use Permit for an Amendment to the Silver Lake PUD - Staff recommends approval <br />with the following conditions: <br />1.The applicant provides signage details consistent with the City’s sign ordinance for <br />separate permitting. <br />2.Access easements are updated as necessary to ensure access and cross use of common <br />private streets in the PUD. <br />3.The applicant provides plans for the proposed trash enclosure verifying consistency of <br />materials between the enclosure and the principal building.
The URL can be used to link to this page
Your browser does not support the video tag.