My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024 Capital Funds book
StAnthony
>
Finance
>
Capital Funds
>
2024 Capital Funds book
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 9:30:47 AM
Creation date
11/15/2023 9:29:47 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Future considerations for Utilities Infrastructure Fund: <br /> <br />• The Utilities Infrastructure currently has a sufficient fund balance to support the <br />programmed equipment replacement through the 2030’s. Water and Sewer operating <br />fund transfers are projected to begin in 2025 to support future capital needs. Annual <br />adjustments to water and sewer rates will ensure that operating transfers are available. <br /> <br />• The 2024 or 2025 Plant components assessment will aid in informing the necessary capital <br />expenditure items and timing of the same. <br /> <br />Stormwater Fund <br /> <br />• A placeholder for an Industrial Park flooding mitigation has moved to 2030, anticipating that <br />redevelopment will not occur until a later date. <br />• Mirror Lake outfall repair is expected to be included in the 2024 street project at an estimated <br />cost of $35,000 <br /> <br />Future considerations for Storm Water Fund: <br /> <br />• The Storm Water fund currently has a sufficient fund balance to support the scheduled <br />replacement throughout 2022-2038 time-frame. Stormwater fund transfers have been <br />used to support the debt levy reduction program as needed in prior years through 2019. <br />Subsequently, Stormwater funds have been used to support stormwater maintenance and <br />water quality programs. This is likely to remain in place for the foreseeable future. <br /> <br />• The stormwater rates have been adjusted over time to support maintenance costs and <br />capital needs. Continuing rate management will ensure sustainability. <br /> <br /> <br />Street Improvement and Debt Service Plan <br /> <br />• The plan reflects the current street improvement schedule and updated projections for <br />future bond interest rates. <br /> <br />• Annual street improvements include a mixture of street, utility and storm water <br />reconstruction, alley improvements and mill and overlays. <br /> <br />• The street improvement schedule and 2024 debt levy reduction program were <br />presented to the City Council at the 5/23/2023 council work session and approved at <br />the 6/27/2023 City Council meeting. <br /> <br />Summary <br /> <br />The proposed 2024 Capital Funds budgets align revenue sources with appropriate needs to ensure <br />sustainability. The budgets as presented are intended to support the Cities present level of services and <br />maintain the City’s infrastructure for current and future community members. <br />
The URL can be used to link to this page
Your browser does not support the video tag.