Laserfiche WebLink
2 <br />8.  Is there any state or county licensing required for the after‐school programming that you will be required  <br />to carry, and if so, what is the status of that licensing? No license is required for the after school program.  <br />9.  Will you be making any changes to the site or building to accommodate the proposed use(s), including  <br />parking lot, green/open space, architectural exteriors, or interior remodeling? Very limited alterations: a few  <br />interior non‐load bearing walls removed to enlarged existing areas for classrooms and open areas for the  <br />Multi‐Purpose Space.  Also, toilets enlarged and miscellaneous sinks added.  <br />10.  Will you be proposing any exterior signage as a part of the occupancy for these uses?  Check the sign  <br />ordinance (Section 155 of the City Code) for details on allowable signage.  Small signage for business name,  <br />planned signage will follow city sign code.  <br />  <br />Thanks for attending to these items.  Assuming that you are able to provide this  additional information to supplement  <br />the application over the next week or so, we are planning on scheduling a public hearing for this item at the June 18,  <br />2024 Planning Commission meeting.  Please let me know if you have any additional questions.  <br />  <br />‐Steve G.  <br />St. Anthony City Planner  <br />‐‐  <br />Stephen Grittman  <br />Grittman Consulting  <br />612‐409‐6503  <br />Steve.GrittmanConsulting@gmail.com