Laserfiche WebLink
November 12, 2024 <br />Page 2 <br />Exemptions include maintenance projects, such as sealcoating and mill/overlays. <br />Exemptions also include residential projects of 4 or fewer units. <br />The quantity of required available charging units are based on the size of the parking lot (30-49 <br />spaces, or 50+ spaces). The charging units must meet Level 1 or Level 2 standards, variable <br />based on size of the facility. <br />An abbreviated copy of Roseville’s web-based summary information is attached below. <br />New Brighton mirrors Roseville’s requirements in code, as follows: <br />(12) Electric Vehicle (EV) Charging. <br />A.All developments with parking lots, with the exception of single- and two-family <br />residences, may include one or more locations to allow for electric vehicle charging, or <br />place infrastructure nearby to facilitate future station installation. The thresholds for <br />adding EV charging spaces to new developments are as follows: <br />B. EV Charging Space Thresholds <br /> <br />The Roseville website adds more information for residents related to definitions and also <br />includes mapping of local public EV charging stations. <br />WORKSESSION ACTION <br />Staff will develop language for the City’s code requirements if consensus is reached for this <br />model. If an alternative is proposed, additional research can be conducted to provide that at a <br />future meeting. <br />ATTACHMENTS <br />Roseville Website Information on EV Charging Requirements