Laserfiche WebLink
12/4/2024 <br />3 <br />PROPOSED UST SYSTEM AND CANOPY REMOVAL <br />•Prepare Site for future sale and redevelopment <br />•Removal and disposal of the three USTs,  <br />product piping, and overhead canopy <br />•Includes Site restoration  <br />•Construction cost = $80K (estimate) <br />•Petroleum contaminated soil will be  <br />encountered and require special management  <br />during the removal activities <br />WSB ENGINEERING SERVICES <br />•Task  1 ‐Prepare a Work  Plan and solicit bids from MPCA  <br />certified tank removal contractors  <br />•Task  2–Provide environmental oversight during UST  <br />removal activities (soil sample collection) <br />•Task  3–Manage contaminated soils encountered during  <br />excavation activities (landfill disposal coordination) <br />•Task  4 – Coordinate with the MPCA  <br />•Task  5–Prepare Petrofund Reimbursement Application  <br />•WSB Fee = $23,310 <br />34