My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 04152025
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2025
>
PL PACKET 04152025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:27:31 PM
Creation date
4/10/2025 1:14:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Regular Meeting Minutes <br />March 18, 2025 <br />Page 5 <br /> <br />6. Additional necessary conditions related to the Comprehensive Plan or local 1 <br />conditions. 2 <br /> 3 <br />The Side Setback Variance includes: 4 <br />• Existing Lot width would result in inadequate width for any building, with 20 foot side 5 <br />yards, common building width, and parking/driveway. 6 <br />• Storm sewer line on north boundary prohibits location of building along the north side 7 <br />of parcel. 8 <br />• Parks access on north side of parcel less likely to interfere with other traffic from 9 <br />townhouses (to north) than multi-family (to south). 10 <br /> 11 <br />The Parking Variance includes: 12 <br />• Applicant notes that assisted living tenants will not have cars on site. 13 <br />• Requirements for underground parking would require significant increase in parking 14 <br />supply and cost but not improve site conditions. 15 <br />• Future conversion to non-senior use would require revisiting the parking supply on the 16 <br />site. 17 <br />• Applicant should quantify employee and daily visit parking demand to confirm 18 <br />proposed 11 space supply. 19 <br /> 20 <br />Mr. Grittman provided drawings of the building design and other elements. The Building 21 <br />Design and Other Elements: 22 <br />• Enhance south building wall and roofline to avoid flat wall design toward the shallow 23 <br />setback. 24 <br />• Maintain No-Parking along street access for emergency response. 25 <br />• Limit additional impervious surface, including under-deck surfaces. 26 <br />• Add landscape treatments to south building wall area. 27 <br />• Discuss elements of sustainability – note that 25% of the site is planted in natural 28 <br />landscape materials. 29 <br /> 30 <br />Planning staff recommends approval of the proposed project, including the Conditional Use 31 <br />Permit, Variance for side setback, and Variance for parking. The land use is clearly within the 32 <br />intent of the zoning ordinance and meets all aspects of the R-4 district with the exception of 33 <br />the two variance requests. 34 <br /> 35 <br />For the setback variance, staff believes that the existing site dimensions dictate the need for 36 <br />shifting the building toward one side property line or the other, and the north boundary is 37 <br />encumbered by an existing storm sewer installation. It would not be reasonable to expect that 38 <br />some other multi-family building could be built on this property as zoned, without a similar 39 <br />setback variance. 40 <br /> 41 <br />The parking variance is a close question. However, given the nature of the use, staff supports 42 <br />the variance as requested. Requiring expensive parking construction that would, in the large 43 <br />majority of cases, go unused is not a reasonable approach to housing development regulation 44 <br />and would unnecessarily increase costs with little or no return in project quality. 45 <br /> 46
The URL can be used to link to this page
Your browser does not support the video tag.