Contractor Bid Tabulation
<br />Former Bear Stop - UST and Canopy Removal
<br />Base Bid Item Rachel Bolander Veit Ramsey Stevens
<br />1 - Cost to obtain ALL necessary local and state permits for the UST
<br />System and canopy removal. It is the expectation that your company
<br />is aware of all required permits and that they will be secured whether
<br />compliance is enforced by local agencies or not.
<br />$1,159.96 $1,250.00 $693.00 $274.00 $1,500.00
<br />2 - Cost for preliminary scope, including participation in pre-bid
<br />walkthrough/meeting and utility mark outs.$322.81 $5,000.00 $1,650.00 $3,508.00 $1,800.00
<br />3 - Cost for mobilization/demobilization, including crew and
<br />equipment.$1,391.95 $4,000.00 $1,770.00 $11,711.00 $8,000.00
<br />4 - Cost for utility clearance, including private locater. $637.98 $1,000.00 $2,320.00 $4,034.00 $900.00
<br />5 - Cost to remove and dispose of the fuel island canopy, vent piping
<br />and associated electrical wiring attached to the canopy (if present).$11,316.15 $8,000.00 $2,980.00 $18,980.00 $8,000.00
<br />6 - Cost to inert all USTs to a level below 10% LEL using an industry
<br />accepted procedure (API standards) and/or to the satisfaction of the
<br />local regulatory agency and the on-site EC.
<br />$12,946.67 $2,000.00 $3,830.00 $1,644.00 $3,000.00
<br />7 - Cost to excavate, remove and dispose/recycle the USTs and
<br />associated product piping. $7,844.98 $19,902.00 $24,350.00 $13,343.00 $30,000.00
<br />8 - Cost to remove and dispose of 100 gallons of residual gasoline
<br />water mixture inside USTs.$290.00 $1,400.00 $464.00 $1,173.00 $3,000.00
<br />9 - Cost to excavate and load 200 CY of contaminated soil (non-
<br />hazardous) that is deemed not suitable for reuse as backfill material
<br />and will require off-site landfill disposal.
<br />$232.00 $1,720.00 $4,130.00 $1,000.00 $8,000.00
<br />10 - Cost to haul 200 CY of contaminated soil (non-hazardous) that is
<br />deemed not suitable for reuse as backfill material and will require off-
<br />site landfill disposal.
<br />$2,602.00 $3,950.00 $6,580.00 $4,400.00 $6,000.00
<br />11 - Cost to dispose of 200 CY of contaminated soil (non-hazardous)
<br />that is deemed not suitable for reuse as backfill material and will
<br />require off-site landfill disposal.
<br />$5,116.00 $7,000.00 $7,490.00 $5,200.00 $14,000.00
<br />11 - Cost to stockpile 200 CY of contaminated soil (non-hazardous)
<br />that is deemed not suitable for reuse as backfill material and will
<br />require off-2site landfill disposal.
<br />$4,468.00 $2,000.00 $4,870.00 $2,400.00 $4,000.00
<br />13 - Cost to import, place and compact (per MnDOT Specification
<br />2106.3.G1) up to 350 cubic yards of clean backfill, as required to
<br />compensate for removed UST and soil disposal volume.
<br />$8,463.00 $8,400.00 $10,510.00 $8,750.00 $12,750.00
<br />14 - Cost to import, place and compact (per MnDOT Specification
<br />2106.3.G1) up to 50 cubic yards of Class 5 gravel top-dressing to
<br />compensate for removed surficial asphalt and concrete.
<br />$2,308.50 $1,400.00 $5,770.00 $2,250.00 $4,000.00
<br />TOTAL BASE BID:$59,100.00 $67,022.00 $77,407.00 $78,667.00 $104,950.00
<br />Unit Costs for Additional Scope Rachel Bolander Veit Ramsey Stevens
<br />1 - Excavating/loading of contaminated soil (non-hazardous), above
<br />and beyond the initial 200 CY estimated in Bid Item #9, that is
<br />deemed not suitable for reuse as backfill material and will require off-
<br />site landfill disposal. Per CY
<br />$5.32 $8.60 $20.65 $5.00 $40.00
<br />2 - Hauling of contaminated soil (non-hazardous), above and beyond
<br />the initial 200 CY estimated in Bid Item #10, that is deemed not
<br />suitable for reuse as backfill material and will require off-site landfill
<br />disposal. Per CY
<br />$28.35 $19.00 $32.90 $22.00 $31.00
<br />3 - Disposal of contaminated soil (non-hazardous), above and beyond
<br />the initial 200 CY estimated in Bid Item #11, that is deemed not
<br />suitable for reuse as backfill material and will require off-site landfill
<br />disposal. Per CY
<br />$27.90 $35.00 $37.45 $26.00 $70.00
<br />4 - Stockpiling of contaminated soil (non-hazardous), above and
<br />beyond the initial 200 CY estimated in Bid Item #12, that is deemed
<br />not suitable for reuse as backfill material and will require off-site
<br />landfill disposal. Per CY
<br />$9.96 $10.00 $24.35 $12.00 $20.00
<br />5 - Cost to import, place and compact (per MnDOT Specification
<br />2106.3.G1) above and beyond the initial 350 CY of clean backfill
<br />estimated in Bid Item #13 as required to compensate for removed
<br />UST and soil disposal volume. Per CY
<br />$26.48 $24.00 $30.05 $25.00 $36.00
<br />6 - Cost to remove and dispose above and beyond the initial 100
<br />gallons of residual gasoline water mixture inside USTs, as estimated
<br />in Bid Item #8. Per Gal
<br />$2.90 $10.00 $5.00 $10.00 $30.00
<br />7 - Standby time. Per Day $1,200.00 $5,500.00 $2,870.00 $2,500.00 $3,600.00
<br />8 - Soil handling (e.g., relocation of stockpiled material). Per CY $9.96 $14.00 $24.35 $14.00 $40.00
|