Laserfiche WebLink
October 28, 2025 St. Anthony Council Work Session - 2 <br />by $1.50. The current recommendation for adjustment in Usage Rate is to continue to manage the <br />growth in usage rates to recognize the revenues provided by the phase-in of the Sewer collection. MCES <br />treatment rate is up 3.5% - based on an increase in volume plus a 2.8% increase in rates. The <br />recommended Sewer usage rate is an increase of $.13 to $5.25 per 1,000 gallons. Ms. Maloney provided <br />a chart showing the adjustment impacts for the 2026 Sewer Rates. Charts were also provided showing <br />Stormwater Rates, Rate Survey, and Impacts by Tier Levels. <br />The Utilities Infrastructure Fund funding sources include connection fees, collection of inter-fund loans, <br />grants (as available), and utility fund transfer (beginning in 2025). The fund uses include water <br />infrastructure & equipment, sewer infrastructure & equipment, and fiber infrastructure & equipment. <br />The 2026 Utilities Infrastructure Fund: <br />Utilities Needs Expected Cost <br />Automation of Backwash Valves at Iron Plant $210,000 <br />Roof replacement for Iron Plant $95,000 <br />City-wide water meters are at the end of their useful life and will need to be replaced $1,100,000 <br />Spread across 3-4 years. <br />Wellhouse 3,4, and 5 roof replacement in 2026 $42,000 <br />Water Treatment Plant Components Assessment Quote (received in 2025)$46,800 <br />The goal of this assessment is to provide a clearer understanding of when major replacement costs may <br />arise within the water treatment facilities. Staff are currently exploring alternative options to reduce the <br />overall cost of the assessment. <br />The Stormwater Fund funding sources include stormwater fees and watershed grants & cost-sharing. <br />The Fund uses include permitting (MS4) & agency Reporting, engineering studies, stormwater pond <br />maintenance, flood improvements, water quality activities, equipment, routine pond treatment <br />expenses, and structural repairs to the water re-use retaining wall that is in danger of failing. <br />Also provided for City Council consideration were 2026 Utility Rates, 2026 Water Fund, 2026 Sewer <br />Fund, 2026 Utility Fund Summary, 2026 Utilities Infrastructure Fund Summary, 2026 Stormwater Fund <br />Summary, Rate Survey, and Long-Range Utility Revenue Plan. <br />Councilmember Elnagdy arrived at the meeting at 5:43 p.m. <br />Councilmember Jenson thanked Ms. Maloney for answering the questions he had. <br />Councilmember Doolan asked about the need to automate and uplift the water infrastructure and asked <br />if that is reflected in the increases to the water rates. She also asked if the outcomes from the <br />engineering report are built into rate increases. Ms. Maloney stated that the infrastructure fund is <br />handling some of the expenses to update the infrastructure as needed. Councilmember Doolan referred <br />to the depreciation schedule and asked if the depreciation references the drawdown of fiscal accounting <br />relating to assets, or is it the usability of the equipment? Ms. Maloney stated that it accounts for the <br />need for future replacement of the equipment. Councilmember Doolan thanked Ms. Maloney for <br />including the comparison to other cities’ rates. She asked about the number of tiers and whether a 5- <br />tiered structure is more complicated. The difference between the first three tiers is based on the <br />quantity of water used. She asked if residents are incentivized to conserve water to reach the lower tier. <br />Ms. Maloney stated it is structured to incentivize conservation. <br />4