Laserfiche WebLink
STAFF REPORT <br />To: Planning Commission Report No.: VI.2. <br />From.: Kiln Moore -Sykes, Assistant City Manager <br />Date: March 21, 2006 <br />Subject: S & T Development -- Office Building Complex <br />Requested Action: Variance to the City's Commercial Parking Requirements <br />Property Address: Vacant Lot adjacent to Tires Plus, 3803 Silver Lake Road <br />Zoning District: Commercial <br />60 -Day Expires: . April 21, 2006 <br />Background: Staff received a call from Todd Mohagen, VSI Construction about the possibility of building an <br />office building on the vacant lot adjacent to Tires Plus. Mr. Mohagen advised Staff that the building will be <br />leased as offices for realtors, insurance agents, accountants, attorneys, etc. Staff has also feet with Brent <br />Thompson, S & T Development, who is the lead in this project. <br />The Zoning Code for the Cornmetcial Zoning District calls for a rni nig,-,um lot size of 15,000 square feet; this <br />vacant lot is 36,892.31 square feet according to the plat. The proposed building has a footprint of 6,441.6 square <br />feet, with two levels, main and lower levels. There also exists a storm water drainage easement to the south and <br />east that significantly- reduces the useable atea on this lot. <br />Parking requirements are based on a gross floor area of 12,883 square feet. The Zoning Code requires one <br />parking space for every 300 square feet, which for this project equals 43 parking spaces. The sketchp tan has 35 <br />parking spaces planned, leaving a deficit of 8 parking spaces. <br />Requested Action: Mr. Thompson, S & T Development, submitted an application for a variance to the City's <br />parking ordinance. According to Staff calculations, he needs a variance for 8 parking spaces. He argues that <br />other similar projects that he has constructed in Roseville and Vadnais Heights have provided 8 parking spaces <br />pet unit and he reports that this number has been sufficient for the tenant. He further states that Staff s <br />calculations, while based strictly on the gross floor area, take into account the HVAC room, the stairwa <br />y, <br />testrooms of the elevator, areas that the applicant feels should not be included in the parking calculations. When <br />these facilities axe removed from the calculation of the gross floor area of the lower level, there is space for only <br />2 or 3 offices. This net floor area calculation reduces the number needed for parking on this project from 8 to 3. <br />The City Ordinance (1650.05 Packing, (e) (6) :requires that Uses in the C District must have at least one parking space for <br />every 300 square feet ofgrosr floor area. As stated above, this calculation indicated that 43 parking spaces are required <br />by Section 1650.05. The applicant indicated also that there is no plan to shape parking with Tires Plus. <br />Another issue associated with this vacant lot is the storm water pond that is pre-existing and was constructed <br />according to the specifications of the Rice Creek Watershed District. This storm water pond accommodates the <br />water run-off from the Tires Plus site as well as any future development that might occur on the adjacent site. <br />The pond is designed to slow water run-off and clean the stotm water before it released from the pond. As <br />0321.06 ST Development.doc <br />13 <br />