My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04252006
StAnthony
>
City Council
>
City Council Packets
>
2006
>
CC PACKET 04252006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2015 11:39:30 AM
Creation date
5/7/2014 2:28:46 PM
Metadata
Fields
Template:
City Council
Document Type
Council Agenda/Packets
Supplemental fields
City Code Chapter Amendment
Keywords
Missing
Ordinance #
Ordinance Summary
Ordinance Title
Planning File #
Property Address
Property PIN
Publication Newspaper
Publication Title
Publication Type
Resolution #
Resolution Summary
Resolution Title
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Todd Hubmer, PE <br />March 29, 2006 <br />Page 2 <br />the existing ditches. The overall existing drainage pattern, ditches and culverts will be maintained. Two <br />proposed culverts, sized per the existing ditch hydraulic capacity, will be constructed parallel to the trail <br />through the proposed fill embankment at the St. Anthony Boulevard ramp. <br />In addition to resolution on these comments, The City of Minneapolis is requesting a City of St. Anthony 20% local <br />match, estimated at $91,000 based on. the current Engineer's Estimate, for project costs within the City of St. <br />Anthony. The local match will be based on actual construction costs. Please let us know if you would like us to <br />attend the April 11 or April 25 Council meeting. A project overview, current preliminary cost estimates, City of <br />Minneapolis Bicycle Plans and Technical Advisory Committee decision matrix are attached. Please call me at (612) <br />3 73 -6 840 with any questions or comments. <br />Sincerely, <br />URS Corp. <br />Anthony L. Wagner, P.E. <br />Project Engineer/Manager <br />Attachments: Project Overview, Preliminary Cost Estimates, <br />City of Mpls. Bicycle Plans, TAC Decision Matrix <br />cc: Greg Brown, file/URS <br />Robb Urquhart, Jack Yuma/City of Minneapolis <br />Jay Hartman/City of St. Anthony <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.