Laserfiche WebLink
CITY OF ST. ANTHONY <br />ASSESSMENT POLICY <br />ASSESSMENT PERIOD <br />Sanitaiy Sewer <br />10 years <br />Water Main <br />10 years <br />Storm Sewer <br />10 years <br />Street Construction <br />10 years <br />Street Resurfacing <br />10 years <br />Sidewalks <br />10 years <br />For seveFal multiple improvements types that occur as part of the same project, the assessment wall <br />shall be 15 years. No assessment for a single improvement wdll shall exceed 10 yews. <br />The following sets forth the City's general assessment policies, but these policies may be modified to <br />the extent. necessary to result in special assessment amounts which do not exceed the special benefits <br />to the respective properties being assessed, unless greater assessments have been agreed to by the <br />owners impacted b theproposed improvements. <br />UPGRADING OF PUBLIC ROADWAYS <br />For reconstruction of existing roadways the City's policy is to replace the existing surface, whether <br />concrete or bituminous with bituminous roadways and concrete curb and gutter. <br />For street reconstruction, 35% of the cost for a project will be obtained from sources other than ad <br />valorem taxes. For street overlay, 50% of the cost for a project will be obtained from sources other <br />than ad valorem taxes. <br />All property will be assessed on a basis of front footage as specified below. <br />1) Non tax-exempt property zoned R-1, R -IA, R-2, and R-3 is shall be assessed a minimum of <br />35%, and the overlay 50%, of the actual cost for a 7 -Con, 32 foot wide bituminous pavement <br />with concrete curb and gutter and routine drainage. The above property w=ill shall be assessed <br />for this type of roadway even if the width or strength is greater. <br />2) All tax-exempt property regardless of zoning class, such as, but not necessarily limited to <br />schools, churches, parks, and government land, well shall be assessed on a front footage basis <br />at 50% of the cost of a 7 -ton, 32 foot wide pavement (BY00WIlell heRVieFFe <br />Bens ted) with concrete curb and mutter and routine drainage. The above property will be <br />assessed for this type of roadway even if the width or strength is greater. <br />3) All property not covered it) the above descriptionls shall be assessed on a front footage basis <br />at 50% of the cost for improvements to the roadway on which they abut. <br />In addition to the costs above, all property may be assessed a proportionate share on a footage basis <br />for expenses such as right-of-way and easement acquisition needed for that. segment of the project <br />including the ariy roadways abutting the property. <br />Page 1 <br />