Laserfiche WebLink
ALLEYS <br />39 <br />Alley reconstruction or overlays shall be assessed at 100% on a front foot basis to the abutting <br />properties. <br />CONDOMINIUMS <br />Assessments above ar shall be spread by dividing them according to the percentage of interest in <br />common elements of the street improvements. <br />MUNICIPAL. STATE -AID ROADWAYS <br />I) Non tax-exempt property zoned R-1, R -IA, R-2, and R-3 which abuts a Municipal State -Aid <br />(MSA) roadway shall not be assessed for improvements of such streets. All such work shall <br />be covered 100% by MSA funds. <br />2) All tax-exempt property, regardless of zoning class, such as, but not necessarily limited to <br />schools, churches, parks, and government land shall be assessed on a front footage basis at <br />50% of the cost of a 7 -ton, 32 foot wide pavement (e�,en when heaN4er i eads are eans6'ueteE" <br />with concrete curb and gutter and routine drainage. The above property will be assessed for <br />this type of roadway even if the width or strength is greater. <br />3) All property not covered in the above shall be assessed on a front footage basis at 50% of the <br />cost for the improvements to the MSA roadway on which they abut. <br />STORM DRAINAGE <br />Improvement costs for storm drainage other than routine drainage shall be paid for wholly out of the <br />storm drainage utility fund and not assessed to benefited properties. <br />SANITARY SEWER & WATER MAIN <br />Improvement costs for sanitary sewer and water main lines improvements shall be <br />paid for wholly out of their respective utility funds and not assessed to benefited properties. N-ew <br />linppq will lip, iRi 10004 of New service lines for individual properties shall be <br />assessed at 100% of actual costs Water service line replacement costs shall include the installation <br />of new curb stops and curb boxes or new gate valves, depending on the size of the water service. <br />SIDEWALKS <br />A rapolq v .a n,,.. r,,,n r,., „ d t., a,,, .. ea a... 1001% „rrr,e-eest- <br />.,..,,e prep <br />Sidewalk replacement as part of street reconstruction projects shall be assessed to all properties <br />abutting the project at the same rate as for street reconstruction, subiectto front footage requirements <br />outlined within this potic <br />New sidewalk installation performed as part of the City's Comprehensive plan on Municipal State <br />Aid roadways shall not be assessed to adjacent property owners. <br />Page 2 <br />